Carrier AquaEdge 19DV Series Start-Up, Operation And Maintenance Instructions Manual page 6

Two-stage back-to-back centrifugal liquid chillers with pic6 controls and hfo r-1233zd(e) 50/60 hz
Table of Contents

Advertisement

1
19
18
17
14
16
15
13
12
11
31
30
Fig. 2 — Typical 19DV 500-800 Ton Two-Stage Compressor Chiller Components
2
10
8
9
32
26
28
27
29
FRONT VIEW
3
4
5
6
7
REAR VIEW
20
21
22
23
24
25
(DV4 Shown)
6
1 — Interconnecting Compressor Piping
2 — VFD Drain (Field Drain Piping Required)
3 — Condenser
4 — Condenser Waterbox Return End
5 — Economizer Isolation Valve (Option)
6 — Economizer
7 — Evaporator Waterbox Return End
8 — Vacuum/Charging Valve (Hidden)
9 — PIC6 HMI Touchscreen Panel
10 — Evaporator Bundle Sight Glasses
11 — Rupture Disc
12 — Suction Elbow
13 — Evaporator Charging Valve and
Evaporator Pressure Transducer
14 — First Stage Guided Vane Actuator
15 — Compressor Motor
16 — Moisture Indicator (Hidden)
17 — Evaporator
18 — Second Stage Guided Vane Actuator
19 — Evaporator Waterbox Nozzles
20 — Condenser Waterbox Nozzles
21 — Condenser Pressure Transducer
22 — Condenser Charging Valve
23 — Envelope Stability Control Pipe
24 — Purge Assembly
25 — Purge Vent (Hidden)
26 — Motor VFD Cooling Moisture Indicator
(Hidden)
27 — Control Panel
28 — Chiller Name Plate Label
29 — Lubrication Assembly
30 — Economizer Pipe
31 — VFD
32 — Discharge Pipe

Advertisement

Table of Contents
loading

Table of Contents