Download Print this page

Bradford White GX225S BN Series Service Manual page 19

Atmospheric gas water heaters

Advertisement

HONEYWELL GAS CONTROL ASSEMBLY TO THERMALWELL
Step 1. Install threaded end of thermowell into water heater. When tight, be sure thermowell flange is
positioned so that thermowell relief opening is in the 6 o'clock position for proper control alignment
(see Figure 35).
6 o'clock position
Step 2. Route lead wires through the relief opening (see Figure 35).
Step 3. Align slots located on the thermowell flange with tabs located on the back of the gas control
(see Figure 36).
Gas control tabs
Step 4. Carefully push the gas control back onto the thermowell flange.
Step 5. Install burner assembly and reconnect pilot tubing and main burner feed line to gas control.
Step 6. Reconnect wire harness and igniter wire to the gas control.
Step 7. Resume water supply to water heater and check for leaks. Be sure tank is full of water.
Step 8. Reconnect the gas supply to gas control. Check for gas leaks using a soapy water solution.
Step 9. To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
SERVICE PROCEDURE AG-III
Honeywell Gas Control and Thermowell
Route wire through
relief opening
Figure 35
Figure 36
Page 19
Replacement
Thermowell
flange slots
19

Advertisement

loading