Complete The Installation; Care And Cleaning - Kohler K-97631 Installation And Care Manual

Hide thumbs Also See for K-97631:
Table of Contents

Advertisement

Available languages

Available languages

Finished Wall

6. Complete the Installation

IMPORTANT! To ensure a successful installation, allow the construction adhesive to cure 24 to 48 hours
before installing the finished wall material. Do not remove the 2x4 bracing until the construction adhesive
has fully cured.
Remove the 2x4 bracing from the rough wall once the construction adhesive on the locker unit has
fully cured.
Install the finished wall material up to the edges of the locker unit.
Apply color-matched 100% silicone sealant around the entire locker unit.
NOTE: Wait 24 hours before using the shower unit.
Prepare the shelves with accessories.
TIP: When preparing the two shelves, use soap and water to guide the hook and basket into the
shelves with ease.
Press the hook into the shelf as shown above.
Press the basket into the shelf as shown above.
Install the shelves into the locker unit.

Care and Cleaning

For best results, keep the following in mind when caring for your KOHLER product:
• Always test your cleaning solution on an inconspicuous area before applying to the entire surface.
Avoid using aerosol products.
• Wipe surfaces clean and rinse completely with water immediately after applying cleaner. Rinse and
dry any overspray that lands on nearby surfaces.
• Do not allow cleaners to soak on surfaces.
• Use a soft, dampened sponge or cloth. Never use an abrasive material such as a brush or scouring
pad to clean surfaces.
• The ideal cleaning technique is to rinse thoroughly and blot dry any water from the surface after
each use.
1248926-2-C
8
Kohler Co.

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-97630

Table of Contents