Download Print this page

Troubleshooting Tips - Yellowtec Intellimix Briefing Book

Hide thumbs Also See for Intellimix:

Advertisement

Available languages

Available languages

Initial Set-Up
Initial Set-Up
Place the CU on a flat surface,
keeping the Ethernet cable
free to avoid wobbling. The
BU can be rack mounted
(1RU) or located next to the
CU. The supplied PoE
Ethernet cable is 10ft (3m),
but you can separate them
by up to 90ft (30m) with an
extension cable. For
distances that exceed 90ft,
use a powered Ethernet hub.
Before powering up your
system for the first time:
1. Connect the PoE Ethernet
cable that is attached to
the CU to the
port
APC 1
on the BU back panel.
2. Connect the brick PSU
DC cable to the
or
PSU 1
port on the BU back
PSU 2
panel.
3. Connect the AC mains cable (supplied) to the CU and an AC source
with a Protective Earth connection.
When power is applied, Intellimix begins its boot sequence by
displaying a snowflake pattern on the fader LEDs. The touchscreen
display lights up and all buttons are backlit when the system is ready.
4. To power down Intellimix, just disconnect the BU's AC mains cable.
If you prefer a physical method to power down without unplugging
the AC cable, connect the BU to an external switch.
NOTE: Intellimix is designed for audio professionals who know how to
power on/off their systems without damaging connected equipment.
Thus, the BU does not include its own power switch.
26

Troubleshooting Tips

The LED indicator on your brick PSU should light up green.
If not, check your AC mains outlet and make sure your AC cable is
connected properly to the BU and outlet. If you are using a power
strip or external switch, make sure it is on.
The PWR LED on the BU front panel should light steadily.
If not, make sure the BU AC power is securely connected at both
ends and that the PoE cable attached to the CU is securely
connected to the BU.
The RDY LED front panel indicator should quickly flash when the
system finishes booting.
If not, disconnect AC power from the BU and power up again.
The snowflake LED pattern should appear on the CU during the
boot sequence.
If not, disconnect the PoE cable from the BU, wait 10 seconds and
reconnect.
WARNING: If you must open the BU enclosure, disconnect it from
an AC power supply and unplug its PoE cable.
Initial Set-Up
27

Advertisement

loading

Related Products for Yellowtec Intellimix