Adjustment At Time Of Parts Replacement; 2Adjusting The Staple Position; Adjusting The Staple Position; Adjusting The Alignment Position - Canon Finisher-T1 Portable Manual

Finisher, sorter, deliverytray
Hide thumbs Also See for Finisher-T1:
Table of Contents

Advertisement

2.2 Adjustment at Time of
Parts Replacement
2.2.1
Adjusting
Alignment Position
Perform this adjustment after replacing the finisher
controller PCB or when the alignment position must
be changed for some reason.
1) Remove the rear upper cover of the finisher unit.
2) Check that the power of the host machine is off and
set SW104 on the finisher controller PCB as follows
according to the paper used for adjustment.
ON
1 2 3 4 5 6 7 8
A4 paper
F-2-12
3) Turn on the power of the host machine.
4) Press SW103 on the finisher controller PCB.
When SW103 is pressed, the swing guide opens and
the alignment plate moves to prescribed position.
5) Place ten sheets of A4/LTR paper between the
alignment plates and push them against the stopper.
6) Press SW101 or SW102 on the finisher controller
PCB and push the alignment plate against the paper.
When SW101 is pressed, alignment plate moves
0.42 mm forward.
When SW102 is pressed, alignment plate moves
0.42 mm backward.
7) When adjustment is complete, remove paper and
press SW103 on the finisher controller PCB once to
store the adjustment in memory.
8) Turn off all bits of finisher controller PCB SW104.
9) Turn off the power of the host machine and install
the rear upper cover of the finisher unit.
2.2.2 Adjusting the Staple
Position
Perform this adjustment after replacing the finisher
the
0009-2568
ON
1 2 3 4 5 6 7 8
LTR paper
0009-2569
controller PCB or when the staple position must be
changed for some reason. This adjustment adjusts the
front/rear stitches with A4/A4R when the paper used
for adjustment is AB type and with LTR/LTRR when
the paper is INCH type.
1) Remove the rear upper cover of the finisher unit.
2) Check that the host machine power is off and set
SW104 on the finisher controller PCB as follows
according to paper/stitch position used for adjustment.
ON
1 2 3 4 5 6 7 8
A4/front stitch
ON
1 2 3 4 5 6 7 8
A4R/front stitch
ON
1 2 3 4 5 6 7 8
LTR/front stitch
ON
1 2 3 4 5 6 7 8
LTRR/front stitch
F-2-13
3) Turn on the host machine power.
4) Press SW103 on the finisher controller PCB.
When SW103 is pressed, the swing guide opens and
the alignment plate moves to prescribed position.
5) Place a sheet of paper between the alignment plates,
push it against the stopper, and push the rear edge of
the paper against the rear alignment plate.
If the gap between the front alignment plate and front
edge of the paper is 1 mm or greater, end staple
position adjustment and repeat staple position
adjustment
after
completing
adjustment.
6) Press SW103 on the finisher controller PCB once to
staple.
However,
remove
manually to verify the staple position because it is not
ejected.
7) Press SW103 on the finisher controller PCB once.
8) If the staple position is correct, insert a sheet of
paper between the aligning plates and push it
against the stopper, push the far end edge of the paper
Chapter 2
ON
1 2 3 4 5 6 7 8
A4/rear stitch
ON
1 2 3 4 5 6 7 8
A4R/rear stitch
ON
1 2 3 4 5 6 7 8
LTR/rear stitch
ON
1 2 3 4 5 6 7 8
LTRR/rear stitch
alignment
plate
the stapled
paper
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Saddle finisher-t2

Table of Contents