Download Print this page
Interlogix TVP-SAM TruVision Installation Instructions
Interlogix TVP-SAM TruVision Installation Instructions

Interlogix TVP-SAM TruVision Installation Instructions

Ptz swing arm mount

Advertisement

Quick Links

TVP-SAM TruVision PTZ Swing Arm Mount
Installation Instructions
Introduction
These instructions help you to install the mounting accessory
that you are using with your Interlogix PTZ. Complete these
instructions first, then return to the PTZ installation manual to
finish installing the PTZ.
The swing arm mount is used to mount a PTZ to a roof
parapet. It swings the PTZ out from a building and in above a
roof for a broader range of surveillance coverage and safer,
easier servicing.
Figure 1: Mount positions out from a building and in above a roof
Figure 2: Package contents
© 2018 United Technologies Corporation.
Interlogix is part of UTC Climate, Controls & Security, a unit of United Technologies Corporation. All rights reserved.
1.
Collar
2.
Swing arm
3.
Mounting plate
(fasteners not provided)
4.
Mounting socket
5.
Safety U bracket
6.
Chase nipple (0.75 in.
conduit)
Product contents
The swing arm
Mounting plate (fasteners not provided)
Safety U bracket
Junction box (fasteners provided)
Chase nipple (3/4 in. conduit)
Gasket
Junction box cover (fasteners provided)
Installation
Installation involves installing the mounting plate, installing the
swing arm, feeding the interconnect cables through the mount,
and installing the junction box.
Caution: For all installations, heed these cautions:
Complete all installation steps before supplying power to
the PTZ.
To ensure proper operation of a PTZ, install the mount
level.
For safety, the mounting surface, hardware, and
procedure used for securing the PTZ must support the
weight of the PTZ, mount, cables, and any structural or
environmental vibration according to local codes.
Installing the mounting plate
1.
Remove the junction box from the mounting plate
(Figure 2 above).
2.
Using the mounting plate as a template, place it level
against the mounting surface and mark the position of the
mounting holes (Figure 3 on page 2). Use all six mounting
holes, if extra support is needed for your installation.
P/N 1053528-EN • REV A • ISS 16JUL18
7.
Junction box cover
(fasteners provided)
8.
Pivot locking screws
9.
Junction box (fasteners
provided)
10. Gasket

Advertisement

loading

Summary of Contents for Interlogix TVP-SAM TruVision

  • Page 1 © 2018 United Technologies Corporation. P/N 1053528-EN • REV A • ISS 16JUL18 Interlogix is part of UTC Climate, Controls & Security, a unit of United Technologies Corporation. All rights reserved.
  • Page 2 Figure 3: Marking the mounting holes Figure 4: Installing the swing arm Middle holes are for extra support. Following all local codes, drill and prepare the mounting holes. Orient the mounting plate such that the socket is up and the junction box is down (Figure 1 on page 1). Securely fasten the mounting plate to the mounting Pivot locking screws surface with the appropriate fasteners.
  • Page 3 / tools / site of your region. firmware Americas: www.interlogix.com EMEA: www.firesecurityproducts.com Manuals are available in several languages. Australia/New Zealand: www.utcfs.com.au Fit the gasket into the junction box cover and attach them both to the junction box using the fasteners provided (Figure 2 on page 1).