Checking The Assignment Of As/Os To The Plant Hierarchy - Siemens SIMATIC PCS 7 SMART Getting Started

Process control system
Table of Contents

Advertisement

Initial work for the project
5.5 Working in the plant hierarchy
5.5.6

Checking the assignment of AS/OS to the plant hierarchy

Hierarchy folders assignment
The individual components of the plant are assigned to specific automation systems and
specific operator stations. This information is provided to each hierarchy folder of the plant
hierarchy. This is only important if you have more than one automation system or operator
station in your project.
In the "color_gs" project, you have only one automation system and one operator station. As
a result, all the hierarchy folders are automatically assigned.
Procedure for checking the assignment
1. Select the "RMT1" hierarchy folder, and select Edit > Object Properties.
The "Properties - Hierarchy Folder" dialog box opens.
2. Select the "AS-OS Assignment" tab.
Here you will find the following assignment:
– In the "Assigned AS (chart folder)" list, you will see the automation system that
– In the "Assigned OS" list, you will see the operator station where data is displayed.
3. Click "OK" to close the dialog box.
58
processes the data.
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
Getting Started, 12/2017, A5E42181435-AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents