Table Of Contents; Introduction; Check List; Approvals - Calomax CASCADE-4 Installation, Operation And Servicing Instructions

Incorporating on/off switch
Table of Contents

Advertisement

CONTENTS
EXPLODED DIAGRAM
WIRING DIAGRAM
PRODUCT SPECIFICATION
Page 2

INTRODUCTION

PAGE 3
Thank you for purchasing a Calomax Cascade boiler. All our
products are designed to give years of simple, reliable operation.
3
To ensure this, it is important that the installation and subsequent
3
servicing is carried out by a suitably qualified engineer in
accordance with these instructions.
4
4
For assistance in finding a suitable engineer in your area, visit our
web site www.calomax.co.uk or contact our service department on
4
0113 249 6681 or e-mail: service@calomax.co.uk
5

CHECK LIST

5
6
Before commencing installation, check that the following parts have
been supplied with the boiler:
6
6
7
8

APPROVALS

8
8
9/12/13
10/11
14/15
16
17
Compliance with these standards has been confirmed through
18
testing by an independent NAMAS approved body
19
Calomax products have been tested and found to comply with the
20
requirements of the Water Supply (Water Fittings) Regulations 1999
for England and Wales Water Bylaws 2000, Scotland and the Water
Regulations Ireland.
1. WRAS approved flexible water inlet hose suitable for
potable water.
2. Status label
3. Stainless steel drip tray
This product conforms to the CE marking directive 93/68/
EEC through compliance with the following standards:
Electromagnetic Compatibility Directive
Low Voltage Directive 73/23/EEC in accordance with:
BS EN 60335-2-63:1993
Page 3

Advertisement

Table of Contents
loading

Table of Contents