Description
6
Remove Function Assy and BT Module.
7
Remove the Speakers.(R/L)
8
Remove the screws of T-con.
9
Completed disassembly.
•
Panel
NOTE
Reassembly procedures are in the reverse order of disassembly procedures.
3. Disassembly and Reassemble
Picture Description
T-con Board
Screws
Torque :
7~8Kgf.cm
6001-002653
3-7