Lincoln Electric Magnum PRO 350 Operator's Manual page 17

Dual procedure and dual schedule
Hide thumbs Also See for Magnum PRO 350:
Table of Contents

Advertisement

D-3
g) Check that the cable boot and both halves of the
strain relief are on the cable. Slip the connector
nut over the copper strands with the thread end
out. Orient gun tube connector so machined flat is
on the same side of the cable as the red and white
control leads. Assemble gun tube connector to
cable by forcing the steel tube of the connector into
the inside diameter of the cable inner tube until the
copper strands are butted against the gun tube
connector shoulder.
NOTE: For best results, insert a .219"/240"
(5.6/6.1mm) diameter rod through the connector and
into core of cable approximately 5.00" (127 mm) when
pushing the connector tube into the cable core tube.
To tighten, hold the connector in place while turning
the nut, then remove the rod from the core. This pro-
cedure assures the inner core does not kink while
assembling or tightening.
CONNECTOR ASSEMBLY
CABLE BOOT
RED AND
BLUE WIRES
MAGNUM® PRO 350, 450 AND 550 DUAL PROCEDURE & DUAL SCHEDULE
MAINTENANCE
Figure E.3
CONTROL WIRES
BLACK AND
DETAIL
WHITE WIRES
(TRIGGER WIRING)
Figure E.4
Keeping the copper strands against the shoulder, pull
the connector nut over the copper strands, engage the
gun tube connector threads, and tighten in place.
(See Figure E.3).
h) For DS:
Pull the cut-off lead terminals off the trigger assem-
bly and connect the replacement control lead ter-
minals. (See Figure E.4).
GUN HOUSING
TRIGGER ASSEMBLY
D-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Magnum pro 450Magnum pro 550

Table of Contents