POINT NAME
INPUTS
G Fan
Y1 Cool 1
Y2 Cool 2
W1 Heat 1
W2 Heat 2
R Power
C Common
DFT 1
DFT 2
OUTPUTS
IFO Fan On
OF OD Fan On
RVS1
RVS2
COMP 1
COMP2
HEAT 2
COM
CONFIGURATION
Select Jumper
2 Compressor
SPEED-UP CONFIGURATION
Speed-Up Jumper
Speed-Up Jumper
NOTES:
1. Jumper for 1-3 seconds: Factory Test — The defrost interval timing is reduced by a factor of 0.1 seconds/minute based on the positions of DIP
switches SW1 and SW2 (i.e. 90 minutes will be reduced to 9 seconds).
2. Jumper for 5-20 seconds: Forced Defrost — Defrost runs for 30 seconds if DFT2 is open.
1
2
1
0
30 minutes
(factory default)

AUXILIARY (ELECTRIC) HEAT CONTROL

The 50TCQ unit can be equipped with one or two auxiliary
electric heaters, to provide a second stage of heating. The DFB
will energize this Heating System for a Stage 2 Heating Com-
mand (heaters operate concurrently with compressor(s) in the
Stage 1 Heating cycle), for an Emergency Heating sequence
(compressors are off and only the electric heaters are ener-
gized) and also during the Defrost cycle (to eliminate a "cold
blow" condition in the space).

DEFROST

The defrost control mode is a time/temperature sequence.
There are two time components: The continuous run period
and the test/defrost cycle period. The temperature component
is provided by Defrost Thermostat 1 and 2 (DFT1 and DFT2)
mounted on the outdoor coil.
The continuous run period is a fixed time period between the
end of the last defrost cycle (or start of the current Heating cy-
cle) during which no defrost will be permitted. This period can
be set at 30, 60, 90 or 120 minutes by changing the positions of
DIP switches SW1 and SW2 (see Fig. 35 and Table 7). The de-
fault run period is 30 minutes.
Shorting the jumpers for a period of 5 to 20 seconds bypasses
the remaining continuous run period and places the unit in a
Forced Defrost mode. If the controlling DFT is closed when
this mode is initiated, the unit will complete a normal defrost
period that will terminate when the controlling DFT opens or
Table 6 — 50TCQ Defrost Board I/O and Jumper Configurations
TYPE OF I/O
CONNECTION PIN NUMBER
DI, 24 vac
DI, 24 vac
DI, 24 vac
DI, 24 vac
DI, 24 vac
24 vac
24 vac
DI, 24 vac
DI, 24 vac
DO, 24 vac
DO, 24 vac
DO, 24 vac
DO, 24 vac
DO, 24 vac
DO, 24 vac
DO, 24 vac
24 vac
24 vac
24 vac
Table 7 — DIP Switch Positions
1
2
1
0
60 minutes
P2-3
P2-5
P2-4
P2-7
P2-6
P3-1
P3-2
DFT-1 to DFT-1
DFT-2 to DFT-2
P3-9
OF
P3-7 to P3-5
P3-6 to P3-4
P3-10
P3-8
E-HEAT
P3-3
P1-1
P1-3
JMP17
JMP18
1
2
1
1
0
0
90 minutes
the 10 minute defrost cycle limit is reached. If the controlling
DFT is open when this mode is initiated, the Defrost cycle will
run for 30 seconds. Both modes end at the end of the Defrost
cycle.
Fig. 35 — DIP Switch Settings - Defrost Board

Electric Heaters

50TCQ units may be equipped with field-installed accessory
electric heaters. The heaters are modular in design, with heater
frames holding open coil resistance wires strung through ce-
ramic insulators, line-break limit switches and a control con-
tactor. One or two heater modules may be used in a unit.
Heater modules are installed in the compartment below the in-
door (supply) fan outlet. Access is through the indoor access
panel. Heater modules slide into the compartment on tracks
along the bottom of the heater opening. See Fig. 36-38.
21
UNIT CONNECTION
CTB-G
CTB-Y1
CTB-Y2
CTB-W1
CTB-W2
CONTL BRD-8
CONTL BRD-4
REHEAT/HP-2
OFR
Energize in COOL
Energize in COOL
FPT1-REHEAT/HP-6
FPT2-REHEAT/HP-8
TB4-1
TB4-3
1
2
1
0
120 minutes
NOTE
Use for 50TCQD
3
On
Off
Fan Delay

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Weathermaker 50tcqa07

Table of Contents