  • Page 1 SGT-750 Operation & Maintenance © Siemens AG 2010. All rights reserved Page 1...
  • Page 2: Preventive Maintenance

    MAINTENANCE PREVENTIVE CORRECTIVE MAINTENANCE MAINTENANCE Troubleshooting Repair Activities OPERATION PERIODIC Lease Engine MAINTENANCE MAINTENANCE PLAN Daily Attendance Time or Cycled Based Maintenance Routine Maintenance Activities Inspection and Overhaul Remote Diagnostic Service © Siemens AG 2010. All rights reserved Page 2...
  • Page 3 12 days B-inspection (Hot Section Exchange) Parts Replacement) 5 days C-inspection (Gas Generator 16 days C-inspection (Overhaul) Exchange with Power Turbine Insp.) Total service cycle downtime 17 days Total service cycle downtime 48 days © Siemens AG 2010. All rights reserved Page 3...
  • Page 4 Specialist analysis of running profile Continuous improvement and Recommendations supervision of plant performance Performance Inspection will be No down-time performed every calendar year when no A, B or C inspection is planned © Siemens AG 2010. All rights reserved Page 4...
  • Page 5 Increased inspection intervals at part load operation Long Term Program (LTP) and comprehensive set of service products to support high reliability/availability for entire service life The SGT-750 viewed from the compressor inlet © Siemens AG 2010. All rights reserved Page 5...