INSTALLATION AND OPERATION

INSTALLATION AND FINAL CHECKOUT

• The regulations and standards applicable in each
particular case must be observed.
• Installation and commissioning must only be
carried out by qualified technicians.
• Electrical wiring must comply with national and
local regulations.
• Always lay the burner ignition cable separately
and as remotely as possible from the device and
other cables.
• Carefully check all cabling and wiring prior to
commissioning.
• Disconnect the actuators completely from the
power supply when working close to terminals
and connections.
• Screw the housing cover securely in place to
provide shock-hazard protection on the actuator
and all electrical connections.
• Electromagnetic emissions must be checked on
a case by case basis.