Two-Speed Pumps; Pilot Safety; Start-Up Procedures; Before Start-Up - Raypak raytherm p-1826 Installation & Operating Instructions Manual

Commercial swimming pool heater
Table of Contents

Advertisement

ADJUSTMENT KNOB
Fig. 30: Pressure Switch Adjustment
5' Max
Fig. 31: Heat Exchanger Height Above/Below Pool
NOTE: If heater is installed outside of the limits
shown, a flow switch must be used in place of the
pressure switch when mounted and wired adjacent
to the heater.

Two-Speed Pumps

In some cases, the flow on the low speed is insufficient
to operate the heater. This is apparent when the pres-
sure switch cannot be further adjusted or if the heater
makes banging noises. In these cases, the pump must
be run at high speed when heating the water.
CAUTION: Do not operate a UG-equipped heater
without properly-adjusted pressure switch.

Pilot Safety

The heater employs a pilot safety which closes the
main gas valve within 8/10ths of a second whenever
the pilot flame is interrupted. Pilot flame is automatical-
ly lit when the device is powered. Unit performs its own
safety check and opens the main valve only after the
pilot is proven to be lit.

START-UP

PROCEDURES

Before Start-Up

Burners
Clean main burners and air louvers of dust, lint and
debris. Keep heater area clear and free from com-
bustibles, flammable liquids, and chemicals. Do not
obstruct the flow of combustion and ventilating air.
Water
Water must be flowing through the heater.
Start-Up
5' Max
CAUTION: Propane gas is heavier than air and
sinks to the ground. Exercise extreme care in lighting
heater in confined areas.
Lighting Instructions
1. Close all gas valves. Turn off electric power supply
wait 5 minutes.
2. Open manual pilot valve. Turn on electric power,
pilot is automatically lighted.
3. Open main gas valve.
4. Set temperature controls to desired temperature.
To Shut Down
Close all manual gas valves. Turn off electric power.
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents