Installing A Domestic Hot Water (Dhw) System; Connecting The Condensate Drain Line - Navien NCB-24LDWE Installation & Operation Manual

Condensing combi boiler, natural gas/lpg
Hide thumbs Also See for NCB-24LDWE:
Table of Contents

Advertisement

4.2 Installing a Domestic Hot Water
(DHW) System
The Navien NCB LDWE boiler provides domestic hot water
continuously when flow is sensed by the flow sensor. This
method is the most efficient means of heating water by allowing
the boiler to operate at a lower return water temperature
by minimizing standby losses, thus increasing combustion
efficiency.
CAUTION
The installation must be made by sufficiently qualified
technicians, authorised to do so.
For correct installation, all the requirements and
recommendations described in the Regulation for
Heating Installations in Buildings (RITE) must be
complied with, together with all other national and/or
local regulations applicable at the time of installation.
Refer to the following illustration for a typical DHW piping
example for the boiler.
Bottom View
DHW Outlet
Water Inlet
Adapter
Adapter
Condensate
Outlet
When installing the DHW system, follow these guidelines:
4.3 Connecting the Condensate Drain
Line
The Navien NCB LDWE boiler creates condensation when it
operates. This condensation has an acidic pH of 3-5. Follow
all local codes and regulations when disposing of condensate
from the boiler. We recommend draining the condensate into
a laundry tub, as the alkali in laundry detergent will neutralise
the acid in the condensate. However, other suitable waste drain
locations may be used according to the local legislation.
The requirements recommended for the condensate drain line
Condensate
installation are as follows:
Drain Hose
Cold Water
Supply
Condensate Pipe
Hot Water Supply
Use only pipes, fittings, valves, and other components (such
as solder), that are approved for use in potable water systems.
Tighten the connection valves with care to avoid damage.
Keep the hot water piping system as short as possible, to
deliver hot water to the fixtures more quickly.
After installing the boiler, clean the cold water inlet filter.
Then, test the boiler for proper DHW supply and inspect for
leaks.
CAUTION
Do not cap or plug the integrated condensate line. If
prevented from draining, condensate can damage the
boiler.
The condensate line must have a negative slope to drain
properly.
For correct condensate drain line installation, the tube must
have a minimum diameter of Ø22 mm.
The tube must be made of a material that can withstand
corrosion, e.g. PVC, PVC-U, ABS, PVC-C or PP. It must not be
made of metal.
For safety reasons, the end of the tube must be as close as
possible to the draining point.
When the condensate drainage is connected to a general
drain network inside the building, the effects of overpressure
that could occur inside it must be taken into account,
installing suitable pressure release and ventilation elements.
The length of the tubes outside the building must be as short
as possible. They must also be installed with as much tilt as
possible. The tubes must be insulated if they are exposed
to extremly cold weather or blizzards. If the tubes are not
insulated, they must have a diameter of at least Ø32 mm.
The drain tube must have a minimum tilt of 2.5° downstream
of the boiler.
For tubes with Ø22 mm, the maximum permitted length is
3 metres.
If the appliance is installed in a non-heated premises, the tube
system must be treated as if it was an outdoor installation.
To prevent the risk of tripping, the outdoor tubes must be
fixed to the walls.
Installing the System Piping
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncb-34ldweNcb-40ldweNcb-28ldwe

Table of Contents