WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all panels before operating.
Failure to do so could result in death or
electrical shock.
OVEN DOOR LATCH ASSEMBLY
Latch
Switch
Refer to page 4-6 for the procedure for servic-
ing an oven door latch assembly.
1.
Disconnect the electrical power to the
double oven.
2.
Disconnect the wires from the door latch
assembly component under test.
3.
Set the ohmmeter to the R x 1 scale.
4.
To test the solenoid, touch the ohmme-
ter leads to the terminals. The meter should
indicate between 47 and 54 Ω.
5.
To test the door or latch switch:
a) Touch the ohmmeter leads to the fol-
lowing terminals (shown embossed on
the switch). The meter should indicate:
COM to N.O. = infinity (no continuity)
COM to N.C. = 0 Ω (continuity)
b) Press the switch actuator button and
touch the ohmmeter leads to the fol-
lowing terminals. The meter should in-
dicate:
COM to N.O. = 0 Ω (continuity)
COM to N.C. = infinity (no continuity)
Disconnect power before servicing.
Replace all panels before operating.
Failure to do so could result in death or
electrical shock.
CONTROL PANEL THERMAL FUSE
Solenoid
Door
Switch
Refer to page 4-2 for the procedure for servic-
ing the control panel thermal fuse.
1.
Disconnect the electrical power to the
double oven.
2.
Set the ohmmeter to the R x 1 scale.
3.
Touch the ohmmeter leads to the control
panel thermal fuse leads at P7-1 and the
main harness connector. The meter should
indicate continuity (closed circuit).
5-4
WARNING
Electrical Shock Hazard
Control Panel Thermal Fuse