GAS BOILER SYSTEM COMMISSIONING CHECKLIST
BLUEHELIX TECH RRT 24 C
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
CONTROLS
ALL SYSTEMS
CENTRAL HEATING MODE
DOMESTIC HOT WATER MODE
CONDENSING BOILERS ONLY
ALL INSTALLATIONS
EN
Fitted
Fitted
Fitted
Fitted
mbar
mbar OR
cod. 3541P250 - Rev. 01 - 07/2018
Optimum start control
Yes
OR
OR
Yes
Yes
OR
Yes
Temperature
AND
²
AND
²
Yes
mbar
mbar
Yes
Ratio
Ratio
Yes
Yes
Yes
Yes
52