Daikin FXSN25AV1 Installation Manual
Daikin FXSN25AV1 Installation Manual

Daikin FXSN25AV1 Installation Manual

Vrv system inverter air conditioners
Hide thumbs Also See for FXSN25AV1:

Advertisement

Quick Links

SYSTEM Inverter Air Conditioners
MODELS
Ceiling-mounted built-in type
FXSN20AV1
FXSN63AV1
FXSN25AV1
FXSN100AV1
FXSN32AV1
FXSN40AV1
FXSN50AV1
READ THESE INSTRUCTIONS CAREFULLY BEFORE INSTALLATION.
KEEP THIS MANUAL IN A HANDY PLACE FOR FUTURE REFERENCE.
LESEN SIE DIESE ANWEISUNGEN VOR DER INSTALLATION SORGFÄLTIG DURCH.
BEWAHREN SIE DIESE ANLEITUNG FÜR SPÄTERE BEZUGNAHME GRIFFBEREIT AUF.
LIRE SOIGNEUSEMENT CES INSTRUCTIONS AVANT L'INSTALLATION.
CONSERVER CE MANUEL A PORTEE DE MAIN POUR REFERENCE ULTERIEURE.
LEA CUIDADOSAMENTE ESTAS INSTRUCCIONES ANTES DE INSTALAR.
GUARDE ESTE MANUAL EN UN LUGAR A MANO PARA LEER EN CASO DE TENER
ALGUNA DUDA.
PRIMA DELL'INSTALLAZIONE LEGGERE ATTENTAMENTE QUESTE ISTRUZIONI.
TENERE QUESTO MANUALE A PORTATA DI MANO PER RIFERIMENTI FUTURI.
ÄΙΑΒΑΣΤΕ ΠΡΟΣΕΚΤΙΚΑ ΑΥΤΕΣ ΤΙΣ ΟÄΗΓΙΕΣ ΠΡΙΝ ΑΠΟ ΤΗΝ ΕΓΚΑΤΑΣΤΑΣΗ ΕΧΕΤΕ ΑΥΤΟ
ΤΟ ΕΓΧΕΙΡΙÄΙΟ ΕΥΚΑΙΡΟ ΓΙΑ ΝΑ ΤΟ ΣΥΜΒΟΥΛΕΥΕΣΤΕ ΣΤΟ ΜΕΛΛΟΝ.
LEES DEZE INSTRUCTIES ZORGVULDIG DOOR VOOR INSTALLATIE. BEWAAR DEZE HAN-
DLEINDING WAAR U HEM KUNT TERUGVINDEN VOOR LATERE NASLAG.
LEIA COM ATENÇÃO ESTAS INSTRUÇÕES ANTES DE REALIZAR A INSTALAÇÃO.
MANTENHA ESTE MANUAL AO SEU ALCANCE PARA FUTURAS CONSULTAS.
ПЕРЕД НАЧАЛОМ МОНТАЖА ВНИМАТЕЛЬНО ОЗНАКОМЬТЕСЬ С ДАННЫМИ
ИНСТРУКЦИЯМИ. СОХРАНИТЕ ДАННОЕ РУКОВОДСТВО В МЕСТЕ, УДОБНОМ ДЛЯ
ОБРАЩЕНИЯ В БУДУЩЕМ.
MONTAJDAN ÖNCE BU TALÝMATLARI DÝKKATLÝ BÝR BÝÇÝMDE OKUYUN.
GELECEKTE BAÞVURMAK ÜZERE BU ELKÝTABINI KOLAY ULAÞABÝLECEÐÝNÝZ BÝR YERDE
MUHAFAZA EDÝN.
INSTALLATION MANUAL
English
Deutsch
Français
Español
Italiano
ëëçíéêÜ
Nederlands
Portugues
óññêèé

Advertisement

Table of Contents
loading

Summary of Contents for Daikin FXSN25AV1

  • Page 1 English SYSTEM Inverter Air Conditioners Deutsch MODELS Français Ceiling-mounted built-in type FXSN20AV1 FXSN63AV1 Español FXSN25AV1 FXSN100AV1 FXSN32AV1 FXSN40AV1 Italiano FXSN50AV1 ëëçíéêÜ READ THESE INSTRUCTIONS CAREFULLY BEFORE INSTALLATION. KEEP THIS MANUAL IN A HANDY PLACE FOR FUTURE REFERENCE. LESEN SIE DIESE ANWEISUNGEN VOR DER INSTALLATION SORGFÄLTIG DURCH.
  • Page 2 2P229632-1...
  • Page 3: Table Of Contents

    VRV SYSTEM Inverter Air Conditioners Installation manual CONTENTS • Install the air conditioner on a foundation strong enough to withstand the weight of the unit. 1. SAFETY PRECAUTIONS..........1 A foundation of insufficient strength may result in the equip- 2. BEFORE INSTALLATION ..........2 ment falling and causing injury.
  • Page 4: Before Installation

    • Do not install the air conditioner in the following locations: • For the installation of an outdoor unit, refer to the installation Where there is a high concentration of mineral oil spray manual attached to the outdoor unit. or vapour (e.g. a kitchen). •...
  • Page 5: Selecting Installation Site

    FOR THE FOLLOWING ITEMS, TAKE SPECIAL Screws for fixing the CARE DURING CONSTRUCTION AND CHECK (Other) Name paper pattern for AFTER INSTALLATION IS FINISHED. installation • Operation manual Quantity 6 pcs. • Installation manual a. Items to be checked after completion of work If not properly done, what is •...
  • Page 6: Preparations Before Installation

    • For standard installation (air inlet on the bottom side), choose one of the below two means of installation. 300 mm Note: For other than standard installation, contact your or more Daikin dealer for details. Maintenance space For mounting air inlet panel with canvas connection Drain pipe...
  • Page 7: Indoor Unit Installation

    (2) Check the unit is horizontally level. For mounting air inlet panel directly CAUTION • The indoor unit is equipped with a built-in drain pump and float switch. At each of the unit’s 4 corners, verify that it is level by using a level or a water-filled vinyl tube. (If the unit is inclined against condensate flow, the float switch may malfunction and cause water to drip.) Air inlet panel...
  • Page 8: Drain Piping Work

    〈For refrigerant piping of outdoor units, see the installation Insulation for fitting manual attached to the outdoor unit.〉 Clamp (accessory) 〈Execute heat insulation work completely on both sides of (× 4 accessory) (For liquid pipe) the gas piping and the liquid piping. Otherwise, a water leakage can result sometimes.〉...
  • Page 9 CAUTION CAUTION Setting the unit at an angle opposite to the drain piping • Drain piping connections might cause leaks. Do not connect the drain piping directly to sewage pipes that smell of ammonia. The ammonia in the sewage might enter •...
  • Page 10: Electric Wiring Work

    ELECTRIC WIRING WORK WIRING EXAMPLE AND HOW TO SET THE REMOTE CONTROLLER GENERAL INSTRUCTIONS • All field supplied parts and materials, electric works must HOW TO CONNECT WIRINGS conform to local codes. • Lower the electric parts box, as shown in the drawing, to •...
  • Page 11 [ PRECAUTIONS ] SETTING OF STATIC PRESSURE CHANGEOVER CONNECTOR 1. Use round crimp-style terminals for connecting wires to the • According to the system static pressure requirement, reposi- power supply terminal block. tion the adaptors of PC board inside the electric parts box as If unavailable, observe the following points when wiring.
  • Page 12 WIRING EXAMPLE (2) Turn the MAIN/SUB changeover switch on one of the two remote controller PC boards to “S”. An example of single-system wiring is shown here. (Leave the switch of the other remote controller set to “M”.) • Connect terminals F1 and F2 (the indoor-to-outdoor termi- nals) in the switchbox of the outdoor unit to terminals F1 and F2 (for the outdoor side) of the first BEV unit (1).
  • Page 13: Field Settings

    10. FIELD SETTINGS Make sure the electric parts box lids are closed on the indoor and outdoor units. Field setting must be made from the remote controller in accordance with the installation condition. • Setting can be made by changing the “Mode No.”, “FIRST CODE NO.”, and “SECOND CODE NO.”.
  • Page 14 3P233622-5F EM08A072B (0901) FS(HT)

Table of Contents