Download Print this page
Pentair HYPRO Cleanload 3376-0870 Original Instruction
Pentair HYPRO Cleanload 3376-0870 Original Instruction

Pentair HYPRO Cleanload 3376-0870 Original Instruction

Chemical eductor

Advertisement

Quick Links

®
HYPRO
Pentair
375 5th Ave., New Brighton, MN 55112
Phone: (651)766-6300 -OR- 800-424-9776 Fax: 800-323-6496
www.hypropumps.com
Cleanload
Chemical Eductor
Original Instruction Manual
Models 3376-0870 and 3376-0871
Models 3376-1170 and 3376-1171
Models 3376-1670 and 3376-1671
Form L-1543
Rev. D

Advertisement

loading

Summary of Contents for Pentair HYPRO Cleanload 3376-0870

  • Page 1 Cleanload ™ Chemical Eductor Form L-1543 ® HYPRO Rev. D Original Instruction Manual Models 3376-0870 and 3376-0871 Models 3376-1170 and 3376-1171 Models 3376-1670 and 3376-1671 Pentair 375 5th Ave., New Brighton, MN 55112 Phone: (651)766-6300 -OR- 800-424-9776 Fax: 800-323-6496 www.hypropumps.com...
  • Page 2: Table Of Contents

    Contents Introduction Description Introduction ..............................Hypro Cleanload chemical eductors are designed to mix fluids and dry chemicals in a self-contained system. The inline Description ............................3 eduction system allows the operator to mix chemicals quickly and safely. The Cleanload operates by receiving a fluid Purpose of Manual ..........................3 into the venturi eductor where a fluid or dry chemical is mixed in.
  • Page 3: Cleanload™ Details

    Cleanload™ Details Tools The Cleanload can be easily mounted with minimal tools and hardware provided by the installer. Mount the Cleanload General Cleanload Details using 3/8” or 10mm bolts. Working Pressure 20-100 PSI 0.7-6.9 bar (See flow data for specific pressure data.) The Cleanload is designed using Imperial (inch) size bolts, but it can be mounted by metric (mm) tools as well.
  • Page 4: Commissioning Start-Up, Operation, Shutdown

    Installation - Start-Up, Operation, Shutdown cont’d. • Elbow fittings, reducers, check valves, and sharp turns in the plumbing create back-pressure on the eductor and Before Operation reduce performance. Their use should be minimized. Instead of sharp turns or elbow fittings, make sweeping Ensure all Cleanload valves are closed prior to starting, and inspect for leaks.
  • Page 5: Maintenance And Servicing

    Start-Up, Operation, Shutdown - cont’d. Parts Illustration CAUTION: Only use Genuine Shutdown Hypro replacement parts. 22. Ensure chemical residue has been flushed from the hopper, and the rinse system valves are closed. Before shutdown, follow steps 8-14 using clean water to rinse the container and sidewall. For sprayers equipped with a clean water rinse tank, follow the sprayer manufacturer’s instructions for pumping from the clean water tank during the final rinse.
  • Page 6: Troubleshooting

    Troubleshooting Notes Symptom Cause Solution Slow Eduction Rate Flow restrictions on outlet side of Replace 90-degree fittings with sweeping eductor. bends using reinforced hose, especially near the eductor outlet. Use 2” (51mm) or larger hose and fittings all the way back to and into the tank.
  • Page 7: Limited Warranty On Hypro/Shurflo Agricultural Pumps And Accessories

    Returns are to be shipped with the RMA number clearly marked on the outside of the package. Hypro shall not be liable for freight damage incurred during shipping. Please package all returns carefully. All products returned for warranty work should be sent shipping charges prepaid to: HYPRO / PENTAIR Attention: Service Department 375 Fifth Avenue NW...