Installing And Connecting Up The Link - Siemens IE/PB LINK PN IO Operating Instructions Manual

Simatic net industrial ethernet / profibus
Table of Contents

Advertisement

Installation, connecting up, commissioning

3.3 Installing and connecting up the LINK

3.3
Installing and connecting up the LINK
Figure 3-2
Installing and connecting up the LINK
Note
Only wire up the LINK with the power switched off.
Mount the LINK as follows:
1. Mount the LINK on the 35 mm DIN rail.
2. Connect the turned off power supply to the LINK. See section X80: External power supply
(Page 27).
3. Connect the LINK to Industrial Ethernet via one of the RJ-45 jacks (X1).
As an alternative you can use bus adapters at X3, that must be plugged in with the power
turned off. When using bus adapters, the Ethernet interface X1 is inactive.
36
X2: PROFIBUS interface: 1 x 9-pin D-sub female connector
X3: Interface for ET 200SP bus adapter (behind the labeling plate)
X50: Receptacle for C-PLUG (behind the labeling plate);
Button. For information on the functions, refer to the section Interfaces, bus adapters, buttons
(Page 26).
X80: Connector for the redundant power supply
X1: PROFINET interface, 2 x RJ-45 jacks with ring ports X1P1R / X1P2R
Connectors of the LINK
Operating Instructions, 11/2017, C79000-G8976-C393-02
IE/PB LINK PN IO

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents