Cecilware ME10EN Operator's Manual

Hide thumbs Also See for ME10EN:

Advertisement

Model ME15EN
Safety Information..................2
Rough-In Drawing...................3
Installation...............................4
Priming ....................................5
Cleaning...................................5
Thank you for purchasing this quality boiler. For your safety and the safety of others, read all warnings and the
operator manual before installing or using the product. Properly instruct all operators. Keep training records. For
future reference, record serial number here:
Grindmaster-Cecilware
4003 Collins Lane, Louisville, KY 40245 USA
Phone: 502.425.4776 Toll Free: 800.695.4500
Fax: 502.425.4664
Web: gmcw.com Email: info@gmcw.com
©2016 Grindmaster-Cecilware
Printed in USA
Water Boilers
ME10EN, ME15EN

Table of Contents

Adjustments ............................6
Maintenance ...........................7
Parts Diagram..........................9
Wiring Diagram.....................10
Operator Manual
Grindmaster-Cecilware
industry's BEST warranty. Visit gmcw.com
for warranty terms and conditions.
Model ME10EN
provides
the
0516 Form #CW-328-01
Part # 390-00073

Advertisement

Table of Contents
loading

Summary of Contents for Cecilware ME10EN

  • Page 1: Table Of Contents

    Operator Manual Water Boilers ME10EN, ME15EN Model ME15EN Model ME10EN Table of Contents Safety Information....2 Adjustments ......6 Rough-In Drawing....3 Maintenance ......7 Installation.......4 Parts Diagram......9 Priming ........5 Wiring Diagram.....10 Cleaning........5 Thank you for purchasing this quality boiler. For your safety and the safety of others, read all warnings and the operator manual before installing or using the product.
  • Page 2: Safety Information

    This equipment must be installed in compliance with applicable Federal, State and/or Local plumbing codes having jurisdiction. This product requires an approved backflow prevention water device, such as a double check valve, that must be installed between the machine and the water supply. GB Series Cecilware Cecilware Water Boilers ®...
  • Page 3: Rough-In Drawing

    7,900 10 AWG NOTE: 1. FIELD WIRING MUST BE SUITABLE FOR 75 DEGREES CELSIUS. 2. USE COPPER WIRE ONLY FOR POWER SUPPLY CONNECTION. 3. 120 VOLT UNITS SUPPLIED WITH A GROUNDED 120V-15A LINE CORD AND PLUG. Water Boilers Cecilware ®...
  • Page 4: Installation

    It was thoroughly inspected before leaving machine and the water supply. Incoming pressure should the factory. In case of damage, contact the shipper, not be greater than 30 psi and not more than 70 psi. Grindmaster-Cecilware. NOTICE: NOTICE: The person installing this appliance is...
  • Page 5: Priming

    Switch OFF the power to the unit at the circuit breaker. Turn off the water line running to the boiler. 1. With power to the unit disconnected, fill unit to capacity. 2. Prepare a sanitizing solution in accordance with Water Boilers Cecilware ®...
  • Page 6: Adjustments

    The Heater Light will go ON, indicating the heating element is activated, wait for it to go OFF, indicating that the water has reached new set temperature. 4. Take a temperature reading and repeat if necessary. Cecilware Water Boilers ®...
  • Page 7: Maintenance

    Prior authorization must obtained from electrical wiring. Grindmaster-Cecilware for all warranty claims. 4. Check dual probe liquid level controller. (See Grindmaster-Cecilware provides the industry’s Component Tests) BEST warranty. Visit our website at gmcw.com for warranty terms and conditions. If Water Runs Out At Overflow Drain 1.
  • Page 8 3. Make sure all wire connections are tight, including ground. 4. If after this, the Controller is still failing to open the Water Inlet Valve, replace it. If lack of water persists, check the probe as follows: Cecilware Water Boilers ®...
  • Page 9: Parts Diagram

    Parts Diagram Water Boilers Cecilware ®...
  • Page 10: Wiring Diagram

    Wiring Diagram Cecilware Water Boilers ®...
  • Page 11 Wiring Diagram (continued) Water Boilers Cecilware ®...
  • Page 12 Wiring Diagram (continued) Cecilware Water Boilers ®...
  • Page 13 HEATERS HOOK-UP TERMINAL CONTACTOR BLOCK 1 PHASE 240 VOLTS G197A (2 x 3.5 KW) TOTAL: 7 KW TERMINAL CONTACTOR BLOCK 3 PHASE 240 VOLTS G197A (3 x 3.5 KW ) SHEET 4 of 4 TOTAL: 10.5 KW Water Boilers Cecilware ®...
  • Page 14 Cecilware Water Boilers ®...
  • Page 15 Water Boilers Cecilware ®...
  • Page 16 Grindmaster-Cecilware 4003 Collins Lane, Louisville, KY 40245 USA Phone: 502.425.4776 Toll Free: 800.695.4500 Fax: 502.425.4664 Web: gmcw.com Email: info@gmcw.com 0516 Form #CW-328-01 ©2016 Grindmaster-Cecilware Part # 390-00073 Printed in USA...

This manual is also suitable for:

Me15enCme15e-nCme10e-n

Table of Contents