Note: For RMS/R 500 Basic Retrofit Kits, the External Harness is the plug pictured
below. It is to be plugged into the right side of the Trip Unit.
--,
)
Step 12:
The Cell Harness is to be mounted in the Breaker Cell. The plug end is to be
mounted on the right front side of the Cell. The Terminal Blocks can be mounted
next to the plug. With the Breaker in the Cell and the External Harness connected
the Breaker should be free to go from disconnect to the connect position, and all
Retrofit wiring should be out of the way.
Step 13:
The Retrofit is now complete and ready to be tested. See the Retrofit Application
Data for test procedures.
7