Storage; Description; Installation; General - ABB AutoLink Instruction Book

15kv, 27kv, 38kv
Hide thumbs Also See for AutoLink:
Table of Contents

Advertisement

TEHI95094 – Rev. 2

4. Storage

When the apparatus is unboxed, it must be carefully unpacked and checked as described
in Chapter 3 of this manual.
If immediate installation is not possible, the product should be kept in its original packing.
If immediate installation is not possible, store the equipment on its original packaging in a
covered, well-ventilated, dry, dust-free, non-corrosive ambient, away from any flammable
materials and at a temperature between -5°C and +45°C.
In any case, avoid any accidental impacts or positioning which stresses the apparatus.

5. Description

The AutoLink Electronic Sectionalizer is a protection device that operates at a permanent
fault in the distribution line. It must be used together with a upstream recloser. Please take
note that the AutoLink is not a fuse tripping device, therefore it cannot be used as a
protection device by itself.
The AutoLink Electronic Sectionalizer is designed ONLY to protect
electrical equipment and NOT for saving people from accidents or
electrocution when contacting energized circuits.

6. Installation

6.1 General

Correct installation is very important. The manufacturer's instructions
must be carefully studied and followed. It is good practice to use
gloves for handling the pieces during installation.

6.2 Installation and service conditions

The following standards must be taken into particular consideration during installation and
service:
-
IEC 60694
-
IEC 61936: Electrical Installation
-
ANSI C37 63: Automatic Sectionalizer
-
All accident prevention regulations in relative countries
For special installation requirements or other operating conditions, please contact ABB.