Beckett CG25 Manual page 28

High/low or modulation
Hide thumbs Also See for CG25:
Table of Contents

Advertisement

The gunassembly is secured insidethe air tubeby
a spring-loaded jackingscrew. It is springloadedin
orderto controlthe forceit canimpose on the gun
assembly.The screwcan be tightened firmlywith-
out putting excessive pressure on thegunassembly
thatmight d istortthegunor damage itsO-ringseals.
Wheninstalling thejackingscrewlookinsidethe air
tubeto verifythatthe pointed tip of thejackingscrew
pinisseated intothesmall h oleonthelocating padon
top of thegun. Thereis alsoanexternal v erification
of correct a ssembly: whenthescrew is fullytightened,
the e-clipon the top on the centerpinshouldcome
flushwiththetopofthescrew.
inspect
Heating
System
Regularly
Lack
of
regular
inspections
and
inadequate
maintenance
could
lead to equipment
malfunction
and
result
in asphyxiation,
explo-
sion
or fire.
(Always follow the appliance manufacturer's recommend-
ed service instructions, when available.)
*
The following checklist is intended to be used as a
minimum reference guide only and does not super-
sede or replace the heating appliance manufacturer's
recommended service and maintenance instructions
or any code requirements.
*
Consult the installation and service instructions pro-
vided by the individual control or component manu-
facturer and carefully follow their directions.
*
Maintenance and testing may be required more fre-
quently due to dusty or severe operating conditions.
*
If unusual or questionable performance is observed,
shut the system down and contact your qualified ser-
vice agency immediately.
28
6104
BCGSO
R08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cg15Cg50

Table of Contents