Wiring Between Dred (Demand Response Enabling Device) And Outdoor Unit - Toshiba RAS-3M26S3AV-A Installation Manual

Multi-split type
Hide thumbs Also See for RAS-3M26S3AV-A:
Table of Contents

Advertisement

Outdoor Unit
9

Wiring between DRED (Demand response enabling device) and Outdoor Unit

This model supports DRM1 DRM2 DRM3.
AS/NZS 4755
Important notice
• Install in accordance with the wiring rules (AS/NZS 3000).
• The precautions described below include important items regarding safety.
Observe them without fail.
• The manufacturer shall not assume any liability for the damage caused by not observing the description of this manual.
WARNING
• Turn off the main power supply switch or breaker before attempting installation.
Make sure all power switches are off. Failure to do so may cause electric shock.
• Connect the connecting wire correctly.
If the connecting wire is incorrect, electric parts may be damaged.
• Ensure that all terminals are securely fi xed, so preventing any external forces having a
negative effect on the terminals.
• Do not connect the DRED mains cable to the terminal block of the outdoor unit
(Power supply and Indoor/Outdoor connecting).
Improper installation may result in fi re.
• Connect the demand connecting wires and relay connector (RJ45) so that they do not
come into contact with the refrigerant cycle parts or refrigerant pipes.
Wire breakage or water intrusion may cause electric shock or fi re.
• Do not screw the DRED signal receiver directly to the outdoor unit.
The screw may damage the internal parts and cause an electric shock, fi re or
refrigerant leak.
CAUTION
• Wear heavy gloves during the installation work to avoid injury.
1116791101_EN.indd 11
1116791101_EN.indd 11
DRM1
DRM2
DRM3
11
Installation Manual
2/3/58 BE 2:20 PM
2/3/58 BE 2:20 PM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-5m34s3av-aRas-4m27s3av-a

Table of Contents