Inflating Tyres On Vehicles With Level Control; With Level Control - Porsche Turbo 2007 Driver Manual

Table of Contents

Advertisement

+ = Positive terminal for jump lead starting
– = Ground point for jump lead starting
3. Connect clips of the compressor to the jump
lead starting terminals.
Always observe the sequence below:
– Open the cap of the positive terminal for jump
lead starting (+).
– Connect positive lead (red) to the positive
terminal for jump lead starting (+).
– Connect negative lead (black) to the negative
terminal for jump lead starting (
280
Minor Repairs
d
Caution!
Danger of burns. The compressor filler hose
can become hot during the inflation process.
f Wear gloves.
4. Switch on compressor.
The required filling pressure will be reached
after a few minutes.
5. Switch off compressor.
6. Check filling pressure with pressure tester.
Then reduce tyre pressure or add more air if
necessary.
Check filling pressure again.
7. Unscrew the compressor filling hose.
Reducing filling pressure on vehicles
without level control
1. Switch off compressor.
2. Open air bleed screw on the filling hose until
the correct filling pressure is achieved.
).
Inflating tyres on vehicles

with level control

The bag with the tyre filling hose is located under
the loadspace floor in the spare-wheel recess.
1. Take tyre filling hose out of the bag.
2. Remove cover in footwell of right front seat.

Advertisement

Table of Contents
loading

Table of Contents