Weekly timer 24 hour timer Infrared remote Wired remote Centralised Online Auto-restart Self diagnosis Multi model control control control controller via application VRV for residential application • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
24 hour timer swing swing steps photocatalytic air purification filter Infrared remote Wired remote Centralised Online Auto-restart Self diagnosis Multi model VRV for control control control controller via application residential application • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
24 hour timer Infrared remote silent operation silent operation swing photocatalytic control air purification filter Wired remote Centralised Online Auto-restart Self diagnosis Multi model VRV for control control controller via application residential application • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
0.17 (4) 0.12 (3) 0.13 (4) 0.14 (4) 0.19 (3) 0.26 (3) Wiring connections - For power supply Remark 3 for power supply, 4 50Hz for interunit wiring (Earth wire included) • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
Page 9
(3) 240V (4) SL: The silent fan level of the air flow rate setting When connected with multi-system outdoor unit, refer to the specifications of the multi outdoor unit to be connected. • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
Operating conditions: power source 220 240 V/220 V 50/60 Hz; JIS standard Background noise already taken into account. Operating noise varies depending on operation and ambient conditions. The operation noise measuring method is in accordance with JISC9612. Measuring location: anechoic chamber 3D092364A • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
Page 24
Operating conditions: power source 220 240 V/220 V 50/60 Hz; JIS standard Background noise already taken into account. Operating noise varies depending on operation and ambient conditions. The operation noise measuring method is in accordance with JISC9612. Measuring location: anechoic chamber 3D094021 • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
Page 25
Operating conditions: power source 220 240 V/220 V 50/60 Hz; JIS standard Background noise already taken into account. Operating noise varies depending on operation and ambient conditions. The operation noise measuring method is in accordance with JISC9612. Measuring location: anechoic chamber 3D094019 • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
Page 26
Operating conditions: power source 220 240 V/220 V 50/60 Hz; JIS standard Background noise already taken into account. Operating noise varies depending on operation and ambient conditions. The operation noise measuring method is in accordance with JISC9612. Measuring location: anechoic chamber 3D094020 • Split - Sky Air • FTXS-K, FTXS-G, CTXS-K...
Page 27
Daikin Europe N.V. Naamloze Vennootschap - Zandvoordestraat 300, B-8400 Oostende - Belgium - www.daikin.eu - BE 0412 120 336 - RPR Oostende Daikin Europe N.V. participates in the Eurovent Certifica- tion programme for Liquid Chilling Packages (LCP), Air handling units (AHU), Fan coil units (FCU) and variable refrigerant flow systems (VRF) Check ongoing validity of certificate online: www.eurovent-certification.com or us-...