Drain Plug Check; Front Protector 1 Installation; Pull-Up Cleat Cover Installation (Fx Cruiser Sho); Reboarding Step Installation - Yamaha WaveRunner FX SHO Service Manual

Table of Contents

Advertisement

HULL
HOOD
Deck and hull
1
b
a
a
1

Drain plug check

2
1. Check:

Front protector 1 installation

1. Install:
NOTE:
Apply soapy water to the inner surfaces a of
the grommets before installing the projections
b of the front protectors.
Pull-up cleat cover installation (FX
Cruiser SHO)
1. Install:
NOTE:
Make sure that the word "YAMAHA" a on
each pull-up cleat cover can be read correctly
from the side of the watercraft as shown.

Reboarding step installation

1
1. Install:
Installation steps:
1. Fasten the brackets in both sides of the
2. Finger tighten all of the bolts, and then
8-54
• Drain plug 1
• O-ring 2
Cracks/damage → Replace the drain
plug.
• Front protectors
• Pull-up cleat covers
• Reboarding step
reboarding step in the down position with
plastic ties 1 as shown so that they will
not return to the up position.
tighten them to the specified torque.
Reboarding step assembly bolt:
16 N·m (1.6 kgf·m, 11.8 ft·lb)
LOCTITE 271
E
1
2
3
4
5
6
7
8
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Waverunner fx cruiser sho

Table of Contents