Download Print this page

Advertisement

Quick Links

Advertisement

loading

Summary of Contents for Westinghouse PD06OD

  • Page 2 Chiller water pressure drop data for the PD tion. units are shown in Table 2. Gauges should be Westinghouse Model PD060 135 Air Cooled installed in the piping to and from the chiller to Packaged Water Chillers are designed for out-...
  • Page 3 A check valve, factory install- maintenance program. Westinghouse offers two types of system con- ed, in the refrigerant circuit between the trol allowing the units to operate at the winter...
  • Page 4 Page 4 PD060-135 Control Settings Pressure Actuated Legend Factory Setting Fan Cycling Pressure Control FCP 1 Cut-In 280 PSIG (Adjustable) FCP2 cut-out 170 PSIG High Pressure Control HP 1 Cut-In 300 PSIG (Manual Reset) H P 2 cut-out 365 PSIG Low Pressure Control LP 1 Cut-In...
  • Page 7 Installation Bulletin P D - G 4 Page 7 Sequence Of Operation Starting Sequence Move control switch "S1" to the “On” posi- and No 2 through T2 Stage 3 and 4. TD2 and Circuit No. 1 de-energizes in the same se- tion.
  • Page 9 Installation Bulletin P D - G 4 Page 9 Sequence Of Operation Starting Sequence Circuit No. 1 de-energizes in the same se- Move control switch "S1" to the “On” posi- and No. 2 through T2 Stage 3 and 4, TD2 and tion.
  • Page 11 Packaged Air Cooled Water Chiller Start Up Procedure Check Points Equipment Inspection: a. Unit damaged on arrival b. Material received agrees with shipping papers Setting Unit: a. Vibration isolator used b. Spring isolator adjusted for equal height c. If rubber in sheer isolators are used, is unit levelled by shimming Wiring: a.
  • Page 12 Chilled water pressure leaving chiller p s i g Westinghouse 0 Commercial Industrial Air Conditioning Division 0 Staunton, VA. 24401 In Canada: Westinghouse Canada Ltd. 492 Speers Road, Oakville, Ontario World wide: Westinghouse Air Conditioning International Westinghouse Bld, Gateway Center, Pittsburgh, PA. 16222 V8/77/6M...