Memorex MVR2041 Service Manual page 9

Hide thumbs Also See for MVR2041:
Table of Contents

Advertisement

2-6: LINK UNIT (Refer to Fig. 2-6)
1.
Set the Link Unit to the Eject position.
2.
Remove the (A) side of the Link Unit first, then remove
the (B) side.
Link Unit
(A)
Main Chassis
2-7: LOADING MOTOR ASS'Y (Refer to Fig. 2-7)
1.
Remove the Link Lever.
2.
Remove the Dumper Spring.
Remove the 2 screws 1.
3.
Unlock the support 2 and remove the Loading Motor Ass'y.
4.
Unlock the 2 supports 3 and remove the Deck PCB (BOT).
5.
Dumper Spring
Main Chassis
• Screw Torque: 5 ± 0.5kgf•cm
2-8: TENSION ASS'Y (Refer to Fig. 2-8-A)
1.
Move the Inclined S Ass'y to the back side.
2.
Remove the Tension Spring.
Unlock the support 1 and remove the Tension Arm
3.
Ass'y.
4.
Remove the Tension Adjust.
Unlock the 2 supports 2 and remove the Tension Band
5.
Ass'y.
Unlock the support 3 and remove the Tension Holder.
6.
7.
Remove the SS Brake Spring.
8.
Remove the SS Arm Brake.
DISASSEMBLY INSTRUCTIONS
(B)
Link Unit
Main Chassis
Fig. 2-6
1
Loading Motor Ass'y
2
3
1
Deck PCB
(BOT)
Link Lever
Fig. 2-7
Tension Spring
SS Brake Spring
SS Arm Brake
NOTE
When you install the Tension Adjust, install as shown in
Fig. 2-8-B. (Refer to Fig. 2-8-B)
2-9: T BRAKE ASS'Y (Refer to Fig. 2-9)
1.
Remove the T Brake Spring.
2.
Remove the T Brake Ass'y.
T Brake Ass'y
B2-2
Tension Adjust
2
2
Tension Band Ass'y
Tension Arm Ass'y
1
Tension Holder
3
Inclined S Ass'y
Adjust the direction of the Marker to inside.
T Brake Spring
Fig. 2-8-A
Fig. 2-8-B
Fig. 2-9

Advertisement

Table of Contents
loading

Table of Contents