Situa-
Channel status
tion
R
U
A
15
x
16
x
17
x
Description
Channel status:
R: aborted
U: interrupted
A: running
10.3.11
Example of a timing diagram for a program run
Examples of signals during a program run:
10.4
Program test
10.4.1
General information on the program test
Purpose
Several control functions are available for testing a new part program. These functions are provided to reduce danger at the
machine and time required for the test phase. It is possible to activate several program test functions simultaneously.
92
Program status
N
U
Swit
A
chg
ear
pro-
tec-
tion
x
x
x
Program status:
N: aborted
U: interrupted
S: stopped
A: running
Active mode
Operator or program action
(Situation after the action)
A
M
J
x
NC Stop (8); at JOG end (6)
x
NC Stop (10); at block end (10)
x
NC Stop (11); at JOG end (11)
Operating modes:
A: AUTO
M: MDA
J: JOG
Function Manual
01/2017