Installing The Conductivity Cell; Connecting Electrical Signal Cables - GE pH/C-900 Operating Instructions Manual

Monitor
Table of Contents

Advertisement

4 Installation

4.3 Installing the conductivity cell

4.3
Installing the conductivity cell
Step
1
2
3
4.4

Connecting electrical signal cables

The sockets for electrical signals are located on the rear panel.
28
NOTICE
The mains power to Monitor pH/C-900 must be switched off before
connecting the instrument to any cells or external equipment.
Action
Place the conductivity cell in a suitable place, for exam-
ple on the shelf of the Monitor UV-900 using the clip
provided with the UV monitor. The cell can be placed
up to 1.5 m from the monitor housing.
Connect the conductivity cell to the socket Conductiv-
ity Flow Cell on the rear panel of the instrument.
Connect the tubing with the Fingertight connectors.
The flow cell itself does not have a recommended flow
direction. In conjunction with the pH electrode, place
the conductivity flow cell and select its flow direction
so that the screw head end of the flow cell faces the
pH flow cell.
WARNING
Power cord. Only use power cords with approved plugs delivered
or approved by GE.
NOTICE
The mains power to Monitor pH/C-900 must be switched off before
connecting the instrument to any cells or external equipment.
Monitor pH/C-900 Operating Instructions 29-0549-25 AB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents