Condensate Drain Trap; Heat Pump Piping Sizes & Connections - Greenheck ERCH-20 Installation, Operation And Maintenance Manual

Energy recovery ventilator with heating and cooling
Table of Contents

Advertisement

Condensate Drain Trap

This unit is equipped with a stainless steel condensate
pan with a 1-inch MPT stainless steel drain connection.
It is important that the drain connection be fitted with a
P trap to ensure proper drainage of condensate while
maintaining internal static pressures.
A P trap assembly (kit) is
supplied with each unit and is
to be assembled and installed
as local conditions require and
according to the assembly
instructions provided with the
P trap. If local and area codes
permit, the condensate may
be drained back onto the roof,
but a drip pad should be provided beneath the outlet.
If local and area codes require a permanent drain line,
it should be fabricated and installed in accordance with
Best Practices and all codes.
In some climates, it will be necessary to provide freeze
protection for the P trap and drain line. The P trap
should be kept filled with water or glycol solution at
all times and it should be protected from freezing to
protect the P trap from damage. If severe weather
conditions occur, it may be necessary to fabricate a P
trap and drain line of metal and install a heat tape to
prevent freezing.
20
Energy Recovery Ventilator with Heating and Cooling
General Description - NOT model specific
Heat Pump Piping Sizes and Connections
Pipe Size
Model
(in. FPT)
ERCH-20
1
ERCH-45
ERCH-20
1.25
ERCH-45
ERCH-20
1.5
ERCH-45
ERCH-55
ERCH-55
2
ERCH-90
Number of
Tonnage
Connections
4
2
8
2
5
2
10
2
6
2
12.5
2
15
2
15
2
17.5
2
20
2
20
2
25
2
30
2
®

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Erch-55Erch-90Erch-45

Table of Contents