Servicing Mode; Test Run; Proper Pump Down Procedure; How To Adjust Water Flow Rate - Panasonic WH-UD30BE5-1 Service Manual

Air-to-water heatpump
Hide thumbs Also See for WH-UD30BE5-1:
Table of Contents

Advertisement

14 Servicing Mode

14.1. Test Run

1. Fill up the boiler tank with water. For details refer to boiler tanks installation instruction and operation instruction.
2. Set ON to the indoor unit and RCCB. Then, for control panel's operation please refers to air-to-water heatpump's operation
instruction.
3. For normal operation, pressure gauge reading should be in between 0.05 MPa and 0.2 MPa.
If necessary, adjust the water pump speed accordingly to obtain normal water pressure operating range. If adjust water pump
speed cannot solve the problem, contact your local authorized dealer.

14.2. Proper Pump Down Procedure

1. Make sure the OFF/ON control panel LED is OFF (no operation).
2. Press the "PUMPDW" switch on control panel to begin PUMP DOWN mode. Operate the system in PUMP DOWN mode for
10 ~ 15 minutes.
3. After 10-15 minutes, (after 1 or 2 minutes in case very low ambient temperatures (< 10°C)), fully close 2 way valve.
4. After 3 minutes, fully close 3 way valve.
5. Press the "OFF/ON" switch on control panel to stop PUMP DOWN mode.
6. Remove the refrigerant piping.

14.3. How To Adjust Water Flow Rate

• The water flow rate can be adjusted with select the water pump speed on the water pump. The default setting is high speed (III).
Adjust it to moderate speed (II) and slow speed (I) if necessary (e.g. reduce the noise of running water).
Below graph shown the external static pressure (mH
O) versus water flow rate (l/min).
2
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wh-ud24be5-1Wh-sd30be5-1Wh-sd24be5-1

Table of Contents