Removal Of Upper Case; Removal Of A-P.c.board; Removal Of K1-P.c.board And K2-P.c.board Block - Panasonic PT-LB75EA Service Manual

Hide thumbs Also See for PT-LB75EA:
Table of Contents

Advertisement

PT-LB80NTU / PT-LB80NTE / PT-LB80NTEA / PT-LB80U / PT-LB80E / PT-LB80EA / PT-LB75NTU / PT-LB75NTE / PT-LB75NTEA / PT-LB75U / PT-LB75E / PT-LB75EA
7.2.

Removal of Upper Case

1. Turn the projector upside down.
2. Unscrew the 7 screws.
3. Return the projector to the normal position.
4. Remove the upper case.
7.3.

Removal of A-P.C.Board

1. Remove the upper case according to the section 7.2.
"Removal of Upper Case".
2. Loosen the 2 screws until they idle, remove the lamp unit
cover.
Note:
· For the interlock switch damage prevention when
reassembling, must remove the lamp unit cover.
3. Unscrew the 2 screws and remove the connector cover.
4. Unscrew the 3 screws and remove the Lamp house.
5. Unscrew the 2 screws and remove the A-P.C.Board block
(with WL-P.C.Board).
6. Unscrew the 12 screws and remove the connector metal
fittings.
Note:
· For
PT-LB80NT**/LB75NT**,
attached on the connector metal fittings. Be careful
with handling.
7.4.
Removal of K1-P.C.Board and
K2-P.C.Board Block
1. Remove the A-P.C.Board block according to the steps 1
through 5 in the section 7.3. "Removal of A-P.C.Board".
2. Loosen the 3 screws until they idle, remove the lamp unit
with the handle.
3. Unscrew the 3 screws and remove the block of Analysis
Block, LCD Block and Projection Lens.
14
WL-P.C.Board
is

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents