Potterton HE Plus Installation & Service Instructions Manual page 29

Table of Contents

Advertisement

Wall Thickness
(X)
Apply Lubricant for
ease of assembly.
Ensure Elbow is fully
engaged into Boiler
Adaptor
(X)
Fig. 40
Waste
© Baxi Heating UK Ltd 2007
Supplied By www.heating spares.co Tel. 0161 620 6677
Fig. 39
20mm
Indicator line
Flue Elbow
Fig. 41
Wall Thickness
Y
Flue
Fig. 42
10.0 Installation
10.6
Fitting The Flue
HORIZONTAL FLUE
1. The standard flue is suitable for lengths between 100mm
minimum and 685mm maximum, as measured from the
edge of the flue elbow outlet to the joint between the
terminal and air duct (Fig. 39).
2. Locate the flue elbow on the adaptor at the top of the
boiler. Set the elbow to the required orientation (Fig. 41).
The elbow is fully engaged when there is a distance of
20mm from the adaptor to the indicator line (Fig. 39a).
NOTE: The flue elbow is angled at 93 degrees to
ensure a fall back to the boiler.
Fig. 39a
3. Measure the distance from the outside wall face to the
elbow. This dimension will be known as 'X' (Fig. 40).
4. To dimension 'X' add 50mm. This dimension to be
known as 'Y'.
IMPORTANT: Check all dimensions before cutting.
Adaptor
5. Mark dimension 'Y' on the flue as shown (Fig. 42).
Carefully cut the waste material from the flue, ensuring that
the ducts are square and free from burrs.
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents