Gas Piping Installation - Navien KDB-535GTD Installation Manual

Medium-sized gas boiler
Table of Contents

Advertisement

M e d i u m - s i z e d g a s b o i l e r
5

Gas piping installation

Be sure to perform the gas leak test after gas pipe
installation, replacement of the burner, or the
supply pressure or head pressure test.
Retention of the leaked gas, combined with static electricity or
spark, may cause a fire
In preparaion for the unexpected gas leak, be sure
to install the gas leak alarm device and the gas
breaker in the boiler room.
Retention of the leaked gas, combined with static electricity
or spark, may cause a fire
Be sure to check the gas to be used for the product
prior to gas piping installation.
Use of the gas, other than the one specified on the name plate
on the front of the boiler, may cause incomplete combustion,
eventually leading to a fire or explosive ignition.
Install the gas holder, if used, in the well-ventilated
outdoor without above ground high voltage power
line. The gas holder shall be fixed not to fall down
on the ground.
If the gas holder falls down or gets in contact with the high
voltage power line, an explosive accident may occur.
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents