Before the Unit can be operated, it is important that the circulating system be filled with water (See Fluid
Recommendations page). On systems with a reservoir, ensure that the drain plug is in place and the plug is secure.
Fill the reservoir through the fill port with clean water. The water level sight glass on the front panel will indicate "Full"
when enough water has been added. Once full, make the final connection to the inlet and outlet of the chiller. On
system without a reservoir, the pump should be primed before operation. Attach a water source to the inlet of the
chiller and fill the Unit with clean water. The system is filled when the water can be seen flowing at the chiller outlet.
Once full, make the final connection to the inlet of the chiller.
Turn the power switch to the "On" position. The switch will light indicating power to the Unit and the pump operates,
the thermostat can be adjusted to the proper setpoint.
S
T
TANDARD
HERMOSTAT
The following procedure should be followed to adjust the Eliwell IC902 thermostat temperature setting:
1. To set the SET POINT, press and release the SET button. SET displays.
2. Press the SET button again, the current SET POINT is displayed. Press the UP or DOWN button to change
the SET POINT to the desired temperature.
3. Press the fnc button twice to exit the program. The current liquid temperature is displayed.
The thermostat has a range that is pre-set at the factory. The range is 40° F (5° C) to 100° F (38° C). If operation
outside of this range is required, please contact the Cornelius Technical Service Department.
When the flow rate to the process is critical, a flow meter and valve should be installed in the line in order to obtain the
proper flow rate.
Once these start-up procedures are complete, the chiller is ready for standard operation.
NOTE: Never operate the chiller with enclosure panels removed. Always use the illuminated switch to
turn off the chiller when it is not being used. Always ensure that all air inlets and outlets are
free of obstructions.
© 2002-2014, Cornelius Inc.

START-UP/OPERATION

E
IC902
LIWELL
out1
Figure 1. Control Panel
- 5 -
CH Series Chiller Operator's & Installation Manual
o
F
fnc
set
Publication Number: 91256

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch751Ch951

Table of Contents