Procedures For Adding Refrigerant; Electrical Wiring Work; Internal Wiring - Parts Table - Daikin ERQ100A7V1B Installation Manual

Hide thumbs Also See for ERQ100A7V1B:
Table of Contents

Advertisement

10.2. 2 procedures for adding refrigerant

How to connect the tank?
1
Liquid line stop valve
2
Gas line stop valve
3
To air handling unit
4
Service port for adding refrigerant
5
Valve A
6
R410A tank
7
Measuring instrument
8
Pipe fixing plate
When the refrigerant tank is connected and the specified operation is
performed, the appropriate amount of refrigerant will be charged into
the system. After charging, the system will stop automatically. The
refrigerant must be charged according to the procedure described
below.
Procedure 1: Charging while the outdoor unit is at a standstill
See
figure
6.
1
Determine the weight of refrigerant to be charged additionally
referring to the item "Additional refrigerant charge" in
calculate the additional refrigerant to be charged" on page 10
and fill in the amount in the "Additional refrigerant charge label"
attached to the unit.
2
After the vacuum drying is finished, open valve A and charge the
additional refrigerant in its liquid state through the service port
on the liquid stop valve taking into account following instructions:
-
Turn on the power of the outdoor unit, control box and air
handling units.
-
Check that gas and liquid stop valves are closed.
-
Stop the compressor and charge the specified weight of
refrigerant.
To avoid compressor breakdown. Do not charge the
refrigerant more than the specified amount.
If the total refrigerant cannot be charged while the
outdoor unit is at a standstill, it is possible to charge
the refrigerant by operating the outdoor unit using the
refrigerant charge function (refer to
on page
16) and follow
the outdoor unit is operating" on page
Installation manual
11
4 5
6
1 2
7
3
"Setting mode 2"
"Procedure 2: Charging while
11.
Procedure 2: Charging while the outdoor unit is operating
See the figure in
1
Completely open the gas side stop valve and liquid side stop
valve. Valve A must be left fully closed.
2
Close the front panel and turn on the power to the control box,
air handling unit and the outdoor unit.
3
Open valve A immediately after starting of the compressor.
4
Charge the additional refrigerant in its liquid state through the
service port of the liquid line stop valve.
5
While the unit is at a standstill and under setting mode 2 (refer to
Checks before initial
set the required function A (additional refrigerant charging
operation) to
led indicates test operation and the remote controller indicates
(test operation) and
6
When the specified amount of refrigerant is charged, push the
BS3 RETURN
The operation automatically stops within 30 minutes.
If the refrigerant charge cannot be finished within 30 minutes,
repeat step 5.
If the operation stops immediately after restart, there is a
possibility that the system is overcharged.
The refrigerant cannot be charged more than this amount.
7
After the refrigerant charge hose is removed, make sure to close
valve A.
11. E
LECTRICAL WIRING WORK
"How to
All wiring must be performed by an authorized
electrician.
All field supplied components and all electric
construction should comply with the applicable local
and national codes.
To persons in charge of electrical wiring work:
Do not operate the unit until the refrigerant piping is
complete. (Running it before the piping is ready will break
the compressor.)
11.1. Internal wiring – Parts table
L............................. Live
N ............................ Neutral
........... Field wiring
.................... Terminal strip
......................... Connector
......................... Protective earth (screw)
.......................... Connection
....................... Relay connector
........................... Functional earthing
.......................... Terminal
......................... Movable connector
.......................... Fixed connector
BLU........................ Blue
BRN ....................... Brown
GRN....................... Green
RED ....................... Red
"How to connect the tank?" on page
start-up,
"Setting the mode" on page
(ON). Then operation starts. The blinking H2P
ON
(external control).
button. Then operation stops.
11.
16),
ERQ100~140A7V1B
Inverter condensing unit
4PW51321-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Erq125a7v1bErq140a7v1b

Table of Contents