Important Safeguards Installation (cont’d) 1. After unpacking, dispose of all packing materials in accordance with local ordinances. 15. Do NOT install in a room that is lower than 55° F. 2. Position the beverage center on a solid, level surface. Use the leveling legs to 16.
Cleaning and Maintenance Installation (cont’d) (cont’d) Shelving Power Interruption Remove the power cord from the electrical outlet when a power outage occurs. The glass shelves and wire rack are removable for you to create a configuration Replace the plug to the AC outlet when power is restored. The temperature will that best suits your beverage needs.
Page 5
(excluding shipping and handling charges). for one year from provable date of purchase. Please send returns to: Within this warranty period, Montgomery Ward will repair or Montgomery Ward, Inc. replace, at its option, defective parts of this...