Operation Panel - Panasonic EY74A2 Service Manual

Hide thumbs Also See for EY74A2:
Table of Contents

Advertisement

4.3.
Removing the Housing.
4.4.
Removing the Interior Components.
1. Remove nine screws.
2. Remove housing B.
3. Remove the F/R selector handle.
4. Remove the operation panel.
5. Remove the square nut.
1. Remove the heat resistant tape and remove the interior components
from the housing A.
* Precautions when securing LED assembly in place using the resistant
tape.
Attach the heat resistant tape at the location shown in the figure below.
2. Remove the clutch handle, H/L change handle and click spring from
the gear block assembly.
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents