5 Installation
Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

5.1 Preliminary checks

Before installing, do the following:
• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) power
supply;
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage;
• Fit tubing to drain away any water leaks which may cause oxidation;
Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra insulation as
compared to the other conductive parts inside;
• Make sure the structure of the gate is sturdy, the hinges work and that there is no friction between moving and non-moving parts;
• Make sure there is a mechanical stop for opening and closing.

5.2 Tools and materials

Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and compliance with the
current standards and regulations. The following figure illustrates the minimum equipment needed by the installer.