Mitsubishi PK12FK Instruction Manual page 39

Table of Contents

Advertisement

2-5 Test run
<Before test run>
After installing, wiring, and piping the indoor and outdoor units, check for refrigerant leakage, looseness in power supply or
control wiring, and mistaken polarity.
Use a 500-volt measure to check the resistance between the power supply terminal block and ground to make sure that it is
at least 1.0MΩ.
Attention:
Do not use the air conditioner if resistance is less than 1.0MΩ.
(PK12/18/24/30/36FK)
CENTRALLY CONTROLLED
POWER
ON
MODE SELECT
F A N
COOL
SET
CHECK
81
TENPERATURE WARMER
SET TEMP
F
TIMER OFF
12
TIMER
MODE
AUTO STOP
HR
AUTO START
LOW HIGH
FAN SPEED LOW/HIGH
AIR
UP/DOWN
DISCHARGE
88
F
AUTO RETURN
TEST RUN
CHECK
Displayed during test run
PK12/18/24/30/36FK
(
PK18/24/30/36FK
SWING
F
COOL
FAN
SPEED
AUTO
RETURN
MODE
TIMER ON/OFF CLOCK/TIMER FAN SPEED AIR DISCHARGE FILTER
SET TEMP.
TIMER SET
REMOTE CONTROLLER
TEST RUN button
Displayed during test run
ON/OFF
COOL/DRY
COOLER
HOURS
SWING
STOP
TEST RUN
TEST RUN button
)
1
2
AIR SWEEP
CHECK
TEST RUN
OC196A-39
<How to operate>
1. Turn ON main power supply.
2. Press TEST RUN button twice. "TEST RUN" is displayed on
remote controller.
3. Press MODE button to check that cool air is being dis-
charged.
4. Press AIR DISCHARGE button to check auto vane opera-
tion.
5. Check outdoor fan operation.
6. Check compressor operation referring to the indoor coil
temperature code displayed on the remote controller. (See
next page.)
7. The test run works for 2 hours and stops automatically. To
cancel the test run, press ON / OFF button or TIMER
ON/OFF button.
8. After checking, turn OFF the main breaker.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents