Throttle Body - Mitsubishi Stealth 1994 Import Service Manual

Table of Contents

Advertisement

MULTIPORT FUEL INJECTION -

THROTTLE BODY

REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
Draining and Supplying of Engine Coolant
l
(Refer to GROUP 0 - Maintenance Service.)
<SOHC-California>
NOTE
The layout of vacuum hoses (No. 3) of the construction drawing
is for the SOHC - Federal, Canada.
Projection
Throttle body
Intake manifold
<DOHC (Non Turbo) - Federal,
3
Canada>
01 FO034
5 N m
4 ftlbs.
IO- 13
SERVICE POINTS OF INSTALLATION
I
9. INSTALLATION OF GASKET
1. ACCELERATOR CABLE ADJUSTMENT
On-Vehicle Inspection of MFI Components
N m
Removal steps
l
2. Connection of air intake hose
3. Connection of vacuum hose
4. Connection of TPS connector
01 FO033
5. Connection of ISC motor connector
6. Connection of water hose
7. Vacuum pipe assembly
8. Throttle body
l
* 9. Gasket
Install the gasket so that the projection is where shown in
the illustration.
Caution
Poor idling etc. may result if the gasket is installed
incorrectly.
For information concerning adjustment of the accelerator
cable, refer to P.l4F-3.
<DOHC (Non Turbo) -California>
3
<DOHC (Turbo)>
3
1. Connection of accelerator cable

Advertisement

Table of Contents
loading

Table of Contents