Drain Valve; Low Water Cutoff Auto Reset - Alpine ALP150B Installation, Operating And Service Instructions

Size range - 80 mbh through 285 mbh
Table of Contents

Advertisement

Vi. Water Piping and Trim
10. Drain Valve (Required)
packaged loose with boiler and must be installed in
the location shown in Figure 20 "Factory Supplied
Piping and Trim Installation" of the Installation,
Operating and Service Instructions.
The alpine boiler heat exchanger is made from stainless steel tubular coil having relatively narrow
waterways. Once filled with water, it will be subject to the effects of corrosion. Failure to take the
following precautions to minimize corrosion and heat exchanger waterways overheating could result in
severe boiler damage.
• Before connecting the boiler, insure the system is free of impurities, grease, sediment, construction
dust, sand, copper dust, flux and any residual boiler water additives. Flush the system thoroughly
and repeatedly, if needed, with clear water mixed with concentrated rinse agent to remove these
contaminants completely.
• iron oxide (red oxide sludge Fe
ence in the system, the system must be air free and leak tight. Do not connect the boiler to radiant
tubing without an oxygen barrier. Using automatic water refill is not recommended, however, if such
refill is employed, a water meter must be added to evaluate the makeup water volume taken after ini-
tial fill and eliminate any water leakage as early as possible.
• Maintain the water pressure in the boiler at a minimum of 14.5 psi (100 kPa).
• The boiler water pH must be within 7.5 < pH < 9.5. if the system contains any aluminum components,
pH must be less than 8.5.
• Black oxide sludge (magnetite Fe
system not protected by an inhibitor.
• Scale deposit is made up of lime scale contained in most distributed water and settles over the warm-
est surfaces of boiler heat exchanger causing subsequent overheating and eventual failure. Water
hardness must be maintained within 3 to 9 grain/gal range.
• refer to Section Xi "Service and Maintenance" for recommended heating system water treatment products
(corrosion/scale inhibitors, cleaners etc) and their suppliers.
103448-07 - 1/16
C. Standard Installation Requirements (continued)
– Drain valve is
nOTiCE
O
) is produced during oxygenation. To minimize any oxygen pres-
2
3
O
) forms as the result of continuous electrolytic corrosion in any
3
4

11. Low Water Cutoff Auto Reset

(Required by some Codes)
Optional Automatic Reset LWCO with harness is
available. Order Part Number 105530-01 when
required.