UTICA BOILERS UB90-50 Installation Manual page 66

Gas-fired, direct vent, condensing, hot water boiler
Table of Contents

Advertisement

B. Condensate Drain Trap Assembly
1
KEY #
1
59019 ½"IDx1/8" THk VINYL TUBING
2
57134 ¾" SNAP GRIP CLAMP
3
62067 ½"ID HOSE TEE
4
62017 ½"NPTx ½"ID TUBE STRAIGHT
5
½" PVC COUPLING, SCH 80
6
½"´4" PVC NIPPLE, SCH 80
7
TEE PVC ½"SLIP x ½"SLIP x ½"NPT FEMALE
8
S. S. CLAMP, SIzE 16 (13/16"~1 ½")
Connect to the drain port at
the bottom of boiler
3
2
DESCRIPTION
REPAIR PARTS
8
66
Connect to the
drain port at
the exhauster
1
7
4
5
6
2
QUANTITY
ITEM NUMBER
AS REqUIRED
6
1
1
1
1
1
1
14631035
14631141
14631320
14631101
14631306
14631322
14631020
14631323

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ub90-75Ub90-100

Table of Contents