GAS BOILER SYSTEM COMMISSIONING CHECKLIST

This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer's instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer's statutory rights.
Customer name:
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT NAME):
Company name:
Company address:
CONTROLS (tick the appropriate boxes)
Time and temperature control to heating
Time and temperature control to hot water
Heating zone valves
Hot water zone valves
Thermostatic radiator valves
Automatic bypass to system
Boiler interlock
ALL SYSTEMS
What system cleaner was used?
What inhibitor was used?
CENTRAL HEATING MODE measure and record:
Gas rate
Burner operating pressure (if applicable)
Central heating return temperature
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)?
DOMESTIC HOT WATER MODE Measure and Record:
Gas rate
Burner operating pressure (at maximum rate)
Cold water inlet temperature
Hot water has been checked at all outlets
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer's instructions and/or BS5546/BS6798
ALL INSTALLATIONS
Record the following:
The heating and hot water system complies with the appropriate Building Regulations
The boiler and associated products have been installed and commissioned in accordance with the manufacturer's instructions
The operation of the boiler and system controls have been demonstrated to and understood by the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
*All installations in England and Wales must be
Competent Persons Scheme. A Building Regulations Compliance
58
© Heating and Hotwater Industry Council (HHIC)
Room thermostat and programmer/timer
Load/weather compensation
Cylinder thermostat and programmer/timer
At max. rate:
CO
At min. rate: (where possible)
CO
to Local Authority Building Control (LABC) either directly or through a
Telephone number:
Gas Safe register number:
Telephone number:
Commissioning date:
Fitted
Fitted
Fitted
Fitted
's instructions
m³/hr
OR
mbar
OR Gas inlet pressure
m³/hr
OR
mbar OR Gas inlet pressure at maximum rate
ppm AND
ppm AND
will then be issued to the customer.
Programmable room thermostat
Optimum start control
Combination Boiler
Not required
Not required
Not required
Not required
Quantity
Yes
Yes
Yes
Yes
Temperature
CO/CO ²
Ratio
CO/CO ²
Ratio
www.centralheating.co.uk
www.centralheating.co.uk
Provided
Yes
litres
No
ft³/hr
mbar
°C
°C
No
No
ft³/hr
mbar
°C
°C
I/min
Yes
Yes
Yes
Yes
Yes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents