Sanyo SBM-20 Service Manual page 6

Automatic
Hide thumbs Also See for SBM-20:
Table of Contents

Advertisement

4.
Operational
Principles
1 )
Operation procedures
L
Refer to the separate instruction manual.
Block diagram
Power
transformer
Power circuit
7=
( I
Motor control
-
>--------lz51-
Heater control
------------
3) Power circuit
"Circuit diagram
ICI
Indicator circuit
E
EIEEEcl -
Ezcl
POWER SUPPLY UNIT
<
>
CONTROL UNIT
1
'1
x
!
K :': :
,- --------
-----
- - .
Rll
+
+
Clm
C107
CI08
G
PTIOI
'- -----D;o;--"-
"-:
IN
OUT
(!)
I
A
Iclol
'/)
B
Voltage at each point (Ground is shown as VDD)
@ -13V
@ -5V
.Description of operation
(1) VDD-VSSPower supply (-5V)
The secondary output of the power transformer
(PT101 ) is given
l-l--r
21
VDD
k
1
cl
42
ICI
Vss
I
bridge-rectification
by the diode
stack (D101 ) and the condenser (Cl 07) to produce -13V voltage at A. The voltage at A is used to
compose B -5V power supply by the operation of constant voltage circuit consisting of 3-terminal
output
voltage regulator (pRIMARY:lCl
01 ).
4
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents