Download Print this page

Potterton NXR4i Assembly Instructions Manual page 4

Hide thumbs Also See for NXR4i:

Advertisement

Boilers supplied with an assembled body
start assembly with stage 19: Hydraulic test.
Front -
Rear
Boiler type
NXR4i-8
NXR4i-9
NXR4i-10
NXR4i-11
NXR4i-12
NXR4i-13
NXR4i-14
(1) Special intermediate section in front of rear section. The shape of
the intermediate element is particular: the slot includes one triangle
instead of two.
Z
See step 10: Assembling the sections.
Ensure that no residue remains between the various
elements ; use if necessary a magnetic rod.
4
Special intermediate
Rear section
section (1)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
For boiler supplied with the boiler body in bulk
Mounting: Assembly of the elements is carried out from back
to front, as illustrated below.
Normal intermediate
section
5
6
7
8
9
10
11
NXR4i
Front section
1
1
1
1
1
1
1
12/07/2011 - 300025089-001-B

Advertisement

loading