Burnham 2PV Series Installation, Operating And Service Instructions

Burnham 2PV Series Installation, Operating And Service Instructions

Power vent gas-fired boiler

Advertisement

N I
S
T
S
E
F
r o
s
e
v r
c i
e
r o
e r
p
i a
b
i o
e l
, r
p
o r
v
d i
e
B
o
l i
r e
B
o
l i
r e
M
o
d
l e
N
u
m
b
r e
2
0
_
P
V
I _
_ -
_
H
e
t a
n i
g
C
o
t n
a r
t c
r o
A
d
d
e r
s
s
8141775R23-10/05
A
L
L
A
T
O I
R
V
C I
E
N I
S
E
R
P
O
W
G
A
S
-
I F
s r
o t
b
i o
e l
, r
c
a
l l
o y
r u
M
o
d
l e
N
u
m
b
r e
a
n
d
B
o
l i
r e
_
_
6
, N
O
P
E
R
S
T
R
U
C
T
E I
S
2
E
R
V
E
N
R
E
D
B
O
h
e
t a
n i
g
c
o
t n
a r
c
o t
. r
S
e
i r
l a
N
u
m
b
r e
a
s
S
e
i r
l a
N
u
m
b
r e
_
_
_
_
_
_
_
A
T
N I
G
A
N
O I
N
S
F
O
R
P
V
T
L I
E
R
W
h
e
n
s
e
e
k
n i
g
i
f n
r o
s
h
o
w
n
o
n
R
t a
n i
g
L
a
n I
s
a t
l l
t a
o i
n
D
a
P
h
o
n
e
N
u
m
b
r e
D
m
t a
o i
n
o
n
b
e
. l
e t
Price - $3.00

Advertisement

Table of Contents
loading

Summary of Contents for Burnham 2PV Series

  • Page 1 Price - $3.00 8141775R23-10/05...
  • Page 2: Table Of Contents

    The following terms are used throughout this manual to bring attention to the presence of hazards of various risk levels, or to important information concerning product life. l l i This Series 2PV Boiler has been approved by the Massachusetts Board of Plumbers and Gas Fitters: Approval No. G3-1200-28. The Commonwealth of Massachusetts requires this product to be installed by a licensed Plumber or Gas Fitter.
  • Page 4: Pre-Installation

    I. Pre-Installation Provide clearance between boiler jacket and combustible material in accordance with local fi re ordinance. See Figure 2 for minimum clearance from combustible material for closet installation. For alcove installation provide top clearance of 27 inches and right side clearance of 6 inches.
  • Page 5: Unpack Boiler

    a. If result is greater than or equal to 50 ft³ per c. Horizontal ducts. Minimum free area of 1 square 1,000 Btuh, space is considered an unconfi ned inch per 2,000 Btu per hour input of all space. equipment in space. Duct cross-sectional area shall be same as opening free area.
  • Page 6: Water Piping

    III. Water Piping and Trim Space heating and domestic water heating with Alliance water heater. Install Alliance water heater as a separate heating zone. Refer to Alliance Installation, Operating and Service Instructions for additional information. If boiler is used in connection with refrigeration systems, boiler must be installed with chilled medium Design and install boiler and system piping to prevent oxygen contamination of boiler water.
  • Page 7 To perform a long term pressure test including the boiler, ALL trapped air must fi rst be removed from the boiler. A loss of pressure during such a test, with no visible water leakage, is an indication that the boiler contained trapped air.
  • Page 8: Gas Piping

    Figure 4B: Boiler Piping for Zone Valve Zoned Heating Systems IV. Gas Piping 3. Length of piping and number of fi ttings. Refer to Size gas piping. Design system to provide adequate gas Table 2 for maximum capacity of Schedule 40 pipe. supply to boiler.
  • Page 9 3. Install sediment trap, ground-joint union and manual shut-off valve upstream of boiler gas control valve and outside jacket. See Figure 6. 4. All above ground gas piping upstream from manual shut-off valve must be electrically continuous and bonded to a grounding electrode. Do not use gas piping as grounding electrode.
  • Page 10: Venting

    V. Venting ® . ) . l i t . r i . i ( . r i Table 5: Burnham Vent System Components " 3 " 3 " 3 " 3 " 3 ° 0 " 3 ° 5 "...
  • Page 11 7. Any improper operation of the common venting system. See Table 5 for complete list of Burnham system should be corrected so the installation Vent System Components. conforms with the National Fuel Gas Code, NFPA 3.
  • Page 12 Maximum support spacing is 5 feet. Do not 6. Seal all Burnham Gasket-Less vent, Burnham mixed penetrate any part of the vent system with fasteners. vent (Gasket-Less and Gasketed) and fi eld cut joints using Dow Corning Silastic 732 RTV, Dow Corning 3.
  • Page 13 Figure 8B: Burnham Gasketed Vent Joint Detail 2. Procedure for joining the female end of Burnham a. Wipe the male end of each joint using an alcohol Gasket-Less Vent with the male end of Burnham pad to remove any dirt and grease.
  • Page 14 h. Once the installation is complete, operate 4-foot horizontal distance is maintained, from appliance and inspect all joints to ensure that fl ue electric meters, gas meters, regulators and relief gases and/or liquid condensate will not escape. equipment. e. Minimum 12 inches from overhang or corner. Horizontal (Through Wall) Vent Installation.
  • Page 15: Electrical

    VI. Electrical General. Install wiring and ground boiler in accordance Wire boiler. Boiler is rated for 120 VAC, 60 hertz, less with requirements of authority having jurisdiction, or in than 12 amperes. A separate electrical circuit must be absence of such requirements the National Electrical run from the main electrical service with an over- Code, ANSI/NFPA 70, and/or the CSA C22.1 Electric current device/disconnect in the circuit.
  • Page 16: System Start-Up

    VII. System Start-up Safe operation and other performance criteria were Prepare to check operation. met with gas manifold and control assembly provided 1. Obtain gas heating value (in Btu per cubic foot) on boiler when boiler underwent tests specifi ed in from gas supplier.
  • Page 17 Check pilot burner fl ame. See Figure 15. Flame should be steady, medium hard blue enveloping 3/8 to ½ inch of sensing probe. Figure 15: Pilot Burner Flame Check main burner fl ame. See Figure 16. Flame should have clearly defi ned inner cone with no yellow tipping.
  • Page 18 1. Adjust thermostat to highest setting. more than 0.3 inch w.c. If boiler is still overfi red, 2. Observe temperature gauge. When temperature is contact your Burnham distributor or Regional indicated, adjust limit to setting below observed Offi ce for replacement Gas Orifi ce.
  • Page 19 Figure 17: Operating Instructions...
  • Page 23 Warning: This product contains refractory ceramic fi bers (RCF). RCF has been classifi ed as a possible human carcinogen. After this product is fi red, RCF may, when exposed to extremely high temperature (>1800F), change into a known human carcinogen. When disturbed as a result of servicing or repair, RCF becomes airborne and, if inhaled, may be hazardous to your health.
  • Page 24: Service

    fl ueways thoroughly from top of boiler as TO TURN OFF GAS TO APPLIANCE. See Figure 17. illustrated in Figure 19. Replace canopy and seal using kit available from Burnham Distributors, Part No. 6111716. F ° Inspect Housekeeping. Boiler area must be clear and free from combustible materials, gasoline and other 6.
  • Page 25 Table 7: Pilot Burner Location ° 0 & & & & Removal or replacement of pilot assembly or pilot assembly parts. If pilot assembly, sensor or pilot orifi ce need replacing, remove main burner with pilot using procedure described in Figure 18: Spark Gap Setting Paragraph F.1.
  • Page 26: Repair Parts

    Figure 20: Procedure for Measuring Fan Pressure IX. Repair Parts All Series 2PV Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require assistance in locating a Burnham distributor in your area, or have questions regarding the availability of Burnham...
  • Page 27 t i t , t l ¼ " 1 ¼ ¼ f i r f i r t t i ¼...
  • Page 28 i t n ] y t , y l ½ " " 2 l i v l l i ¼ ½ , " " 6 ¼ " " 6 " 6 l l i ½ "...
  • Page 29 t i t ° 0 f i r f i r - - - - - - - - - f i r - - - " 6 - f l l l i , "...
  • Page 30 t i t , y l , y l f i r f i r t t i " 8 ¼ " 8 " 0 ½ ½ ½ ½ , "...
  • Page 31 t i t ½ " e l l e l l f i l f i l...
  • Page 33 t i t ¾ , t i , l l ½ , l l ¾ " 4 " 4 ½ " o l l o l l c i l " 6 " 2 c i l " 6 " 3 c i l "...
  • Page 34 t i t...
  • Page 35: Low Water Cut Off

    X. Low Water Cut Off (LWCO) on Hot Water Boilers f i t . f f When draining the heating system. Many probe LWCO manufacturers recommend an annual inspection of the A low water cutoff is required to protect a hot water probe.
  • Page 36: Limited Warranty

    Warranty Card within ten days after the product obsolescence or redesign, the value used to establish the retail price will be the published price as shown in the Burnham Hydronics installation of the boiler, although failure to comply with this request will Repair Parts Price Sheet where the heat exchanger last appeared or the not void the owner’s rights under these warranties.

Table of Contents